To provide a required manual fire alarm system and an automatic fire detection system per IFC 2000. The fire alarm system includes sprinkler monitoring, required automatic detection, HVAC shutdown, fire/smoke damper control, door release, elevator recall/shutdown (2ea.), cooking hood monitoring (1ea.) and notification throughout.

9/28/2005 - The omission of manual pull stations is acceptable based on Comment under Fire Alarm System Requirements (IFC Review, completed by Sam Rogers, 2/28/2005) that manual pull stations will not be required at all exits based upon the exceptions for R-1 occupancies in IFC 2003. One is required at an approved location, which as shown on the plans at the front desk is acceptable.

The associated building permit (BLD 04-03025) is to construct a new 102,196 sq.ft. 4- story, wood framed, 110 guest room extended stay hotel with a restaurant, lodge area, indoor swimming pool and spa area. The installation of horizontal exits on each floor is used for travel distance to the exits. Note: This building is fully fire sprinklered for area increase. This permit does not include the construction of the swimming pool and related equipment. All construction per the approved plans and attached comment list. Refer to BLD 05-00477 for grading permit. MJP DRH 03-189 CUP 03-00076 (HOMEWOOD SUITES-HILTON HOTEL)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/6/20072/7/20072/7/2007APASS
DetailsTroy Cobbley
Permit finaled. Inspection was performed by Brian Johnson
INSP-Final Inspection2/6/20072/6/20072/6/2007PFAIL
DetailsTroy Cobbley
Per Brian the first floor and second floors are now complete. Third and fourth floors will be started tomorrow.
INSP-Final Inspection2/5/20072/5/20072/5/2007AFAIL
DetailsTroy Cobbley
The remaining areas of the first floor were tested by Brian today except for the east elevator. See the city approved plans for locations of deficiencies.
INSP-Final Inspection2/1/20072/2/20072/2/2007AFAIL
DetailsTroy Cobbley
The north elevator was all that was tested today.
INSP-Final Inspection1/31/20072/1/20072/1/2007AFAIL
DetailsTroy Cobbley
Items tested today include the facp and three nac panels on the first floor. Also tested are all of the sprinkler devices.
FIR-Aging Inspection4/11/20064/11/20064/11/2006 NR
DetailsTroy Cobbley
Work is in progress