Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR05-00480
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3657 S T-K AVE
Project NameSPR OH SFP II BUILDING 2
Customer Number 
ePlanReview 
Description
SFP II BUILDING 2 * To install a complete overhead fire sprinkler system meeting BMC 7-01-56-903.1.6, High Piled Combustible Storage Warehouse, in a new 29,370-ft/2, one story, concrete tilt-up shell office/warehouse building with a 140-ft/2 fire riser/electrical room, constructed at the east end of the building and six, 12'x14' overhead doors at the north wall (BLD permit addresses two?). This is a shell permit only and no occupancy is allowed under this permit. A separate T.I. permit will be required to finish this building for occupancy. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-00467
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/10/200511/14/200511/14/2005APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection11/9/200511/10/200511/10/2005ACANC
DetailsTroy Cobbley
No time for inspection
INSP-Sprinkler Rough-in9/28/20059/28/20059/29/2005PFAIL
DetailsForrest France
EC25's are overspaced at southeast side branch line above where unit heater has been deleted, in three locations upright heads are directly below roof/smoke hatches, need verification of approval on changes in the mech. and electrical rooms.
INSP-Conference9/29/20059/29/20059/29/2005PDONE
DetailsForrest France
Conversation with contractor regarding area at SE corner in which heads are overspaced, also discussed three locations at roof hatches with EC25 sprinklers directly below the hatch opening.
INSP-Sprinkler Rough-in/Hydro9/27/20059/27/20059/27/2005PPART
DetailsForrest France
Overhead hydrostatic test passed inspection.