INSP-Final Inspection | 11/29/2006 | 12/4/2006 | 12/5/2006 | P | PASS |
Forrest France
|
|
|
Required corrections have been completed, inspection passed, permit finaled.
|
INSP-Final Inspection | 10/13/2006 | 10/16/2006 | 10/17/2006 | P | FAIL |
Forrest France
|
|
|
Two items on the previous correction notice dated 2/16/06 are not complete including inadequate dB in the storage room and a penthouse av which is non-functional.
|
INSP-Final Inspection | 2/15/2006 | 2/16/2006 | 2/17/2006 | P | FAIL |
Forrest France
|
|
|
"Office" room 905 is now a confrence room requiring visual notification, provide smoke detection at the restroom and telephone rooms, relocate SD in the lobby to afford proper coverage, the "closet" room lacks proper visual notification, provide an additional strobe to cover the blind spot at the east common area, dB level in the storage room is not adequate, the penthouse AV is non-functional on audio, provide resubmittals reflecting all modifications and required changes.
|
INSP-Final Inspection | 2/13/2006 | 2/15/2006 | 2/15/2006 | P | CANC |
Forrest France
|
|
|
Inspection cancelled per conversation with contractor due to schedule conflicts.
|