Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00520
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 370 S 8TH ST
Project NameANN TAYLOR LOFT BODO 7 WEST SP
Customer Number 
ePlanReview 
Description
(ANN TAYLOR LOFT - BODO BLDG #7 - WEST SIDE) To install fire sprinklers in the creation of a new 5,292-ft/2 retail sales tenant space within a new 135,950-ft/2 building, located on the 1st story, on the West side of the building. Fire sprinkler work is related to new interior nonbearing walls, 2 restrooms and suspended ceilings. This building is required to be fully fire sprinklered. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The shell permit is: FIR05-00372. This permit is attached to building permit: BLD05-00850.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/21/20064/21/20064/21/2006PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/3/20062/6/20062/6/2006ADEFR
DetailsForrest France
Final pending the completion and final of the shell fire sprinkler permit FIR05-00372.
INSP-Final Inspection11/1/200511/1/200511/1/2005PPASS
DetailsForrest France
Fire sprinkler finaled.
INSP-Final Inspection10/27/200510/28/200510/28/2005APART
DetailsForrest France
Fire sprinkler is acceptable when shell system is operational and approved.
INSP-Final Inspection10/24/200510/24/200510/24/2005PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 10/24/2005 at 7:58:44 AM. Contact: ###-####. canc kirk
INSP-Final Inspection10/3/200510/3/200510/3/2005PPART
DetailsForrest France
Heads and escutcheons have been installed, ready for final when fire pump for water supply and riser are complete.
INSP-Sprinkler Rough-in/Hydro9/29/20059/30/20059/30/2005APART
DetailsForrest France
Branch line directly above electrical panel needs to be relocated, the remainder of overhead rough-in is good for cover.