Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR05-00536
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1055 N CURTIS RD
Project NameSPR CNTL REMOD N & S TWRS
Customer Number 
ePlanReview 
Description
The data has been moved to a Word document attached to this case.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/19/20083/19/20083/20/2008PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in2/4/20082/4/20082/4/2008PPASS
DetailsTroy Cobbley
The sprinkler modifications in the south tower second floor at the cafeteria are complete.
INSP-Sprinkler Rough-in11/14/200711/15/200711/15/2007APASS
DetailsTroy Cobbley
The fourth floor piping at the connection between the north tower and the central tower is ok to cover.
INSP-Sprinkler Rough-in11/6/200711/6/200711/6/2007PPART
DetailsTroy Cobbley
The piping at the 5th floor connection between the north tower and the central tower is ok to cover
INSP-Final Inspection10/18/200710/19/200710/19/2007APART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission. The temporary occupancy is for only the areas as agreed upon by McCarthy Construction, Boise Fire Dept. and the Building Department. These areas include the basement, 1st floor, 2nd floor, 3rd floor, 6th floor, 7th floor and penthouse. A fire watch is to remain on the 6th and 7th floors.
INSP-Final Inspection10/15/200710/15/200710/19/2007PCANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Final Inspection10/18/200710/18/200710/18/2007PPART
DetailsTroy Cobbley
This inspection was actually for the eighth and ninth floors. They are ready for final when the time comes.
INSP-Final Inspection10/17/200710/17/200710/18/2007PCANC
DetailsTroy Cobbley
overbooked
INSP-Sprinkler Rough-in10/12/200710/15/200710/15/2007APASS
DetailsTroy Cobbley
Overhead hydro test for 7th and 8th floors passed.
INSP-Final Inspection10/11/200710/12/200710/12/2007APASS
DetailsTroy Cobbley
The fourth and fifth floor sprinkler systems are ready to final except the alarm interconnections need tested.
INSP-Sprinkler Rough-in10/11/200710/11/200710/11/2007PPART
DetailsForrest France
OK to cover 9th floor eyebrow
INSP-Sprinkler Rough-in10/10/200710/10/200710/10/2007PPASS
DetailsTroy Cobbley
The north half of the 9th floor is ok to cover except the rooms in the "eye brow"
INSP-Sprinkler Rough-in10/8/200710/8/200710/8/2007PPASS
DetailsTroy Cobbley
The south half of the 9th floor is ok to cover.
INSP-Sprinkler Rough-in10/4/200710/4/200710/4/2007PPASS
DetailsTroy Cobbley
The remaining piping on the 8th floor is ok to cover.
INSP-Sprinkler Rough-in/Hydro10/1/200710/2/200710/3/2007APASS
DetailsTroy Cobbley
The south half of the 8th floor sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in10/1/200710/1/200710/2/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the locations on the 8th floor south half where the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in9/28/20079/28/20079/28/2007PPASS
DetailsTroy Cobbley
The two sprinkler heads and related sprinkler piping located above the "rulon" ceiling on the 9th floor.
INSP-Sprinkler Rough-in9/25/20079/26/20079/26/2007APASS
DetailsTroy Cobbley
The piping on the second floor of the south tower is ok to cover.
INSP-Sprinkler Rough-in9/24/20079/25/20079/25/2007ACANC
DetailsTroy Cobbley
Rick; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
INSP-Sprinkler Rough-in9/18/20079/18/20079/18/2007PPASS
DetailsTroy Cobbley
Fifth floor sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in9/13/20079/14/20079/14/2007APASS
DetailsTroy Cobbley
The electrical wiring has been removed from the sprinkler piping on the fourth floor.
INSP-Final Inspection9/10/20079/11/20079/11/2007PFAIL
DetailsTroy Cobbley
It appears at this time that the areas covered under phase one are complete. This includes the basement, first, second, third, sixth, seventh and penthouse floors. A portion of the south tower where it connects to the new central tower is still under construction but is separated from the central tower by walls and doors.
INSP-Final Inspection9/7/20079/10/20079/11/2007AFAIL
DetailsTroy Cobbley
Not all work is complete
INSP-Final Inspection9/6/20079/7/20079/7/2007AFAIL
DetailsTroy Cobbley
The east system of the second floor is ready to final.
INSP-Final Inspection9/5/20079/6/20079/6/2007AFAIL
DetailsTroy Cobbley
The west half of the second floor sprinkler system is ok to final when the missing head in the electrical closet is installed.
INSP-Final Inspection9/4/20079/5/20079/5/2007ADONE
DetailsTroy Cobbley
The basement and first floors of the central tower are basically ready for final. The basement has a couple of small issues. In a shower a cabinet has been installed and is blocking sprinkler coverage and in the east stairwell a hanger has been removed and the head under the stairs still has tape on it.
INSP-Final Inspection9/4/20079/4/20079/4/2007PFAIL
DetailsTroy Cobbley
We had a key for access but ceiling tile was missing from every room. The inspection was stopped after the fifth room. This was on the first floor.
INSP-Final Inspection8/31/20078/31/20078/31/2007PCANC
DetailsTroy Cobbley
See inspection request for this morning for inspection notes.
INSP-Final Inspection8/30/20078/31/20078/31/2007AFAIL
DetailsTroy Cobbley
There are many rooms that are missing ceiling tile and are locked with no access to inspect. Project was not ready for inspection.
INSP-Final Inspection8/29/20078/30/20078/30/2007ACANC
DetailsForrest France
Overbooked
INSP-Final Inspection8/29/20078/29/20078/29/2007PCANC
DetailsTroy Cobbley
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
INSP-Sprinkler Rough-in8/28/20078/28/20078/28/2007PPASS
DetailsTroy Cobbley
The overhead piping in the emergency entrance corridor is ok to cover
INSP-Sprinkler Rough-in/Hydro8/24/20078/27/20078/27/2007APASS
DetailsTroy Cobbley
Penthouse hydro test passed.
INSP-Sprinkler Rough-in8/21/20078/21/20078/21/2007PPASS
DetailsTroy Cobbley
See the city approved drawings for the area on the 3rd floor that is ok to cover. Also the rough-in inspection for the penthouse is passed except for areas marked on the plans.
INSP-Sprinkler Rough-in/Hydro8/16/20078/17/20078/17/2007APASS
DetailsTroy Cobbley
6th and 7th floor hydro tests passed
INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007APASS
DetailsTroy Cobbley
Third floor hydro test passed
INSP-Sprinkler Rough-in8/15/20078/15/20078/15/2007PPASS
DetailsTroy Cobbley
See the city approved plans for areas on the fourth floor where the piping is ok to cover
INSP-Sprinkler Rough-in8/14/20078/14/20078/14/2007PFAIL
DetailsTroy Cobbley
The piping layout in the existing areas does not match the approved plans. Starter pieces are shown as 1" where as the actual piping has 1 1/4" piping. There are branchlines where none are shown. Plans need to be resubmitted to reflect the actual conditions.
INSP-Sprinkler Rough-in8/13/20078/13/20078/13/2007PPASS
DetailsTroy Cobbley
See the resubmitted fire sprinkler plans for locations where the reconfigured piping is approved for cover.
INSP-Sprinkler Rough-in8/10/20078/10/20078/10/2007APART
DetailsForrest France
OH rough-in is approved as noted for shell areas on the 6th and 7th floors see sheets FP 22,23,24,25 on stamped resubmittals, three rooms as noted on each floor no access provided, one area each floor needs to have the temp. walls removed to eliminate obstruction issues for shell system protection.
INSP-Sprinkler Rough-in8/8/20078/9/20078/10/2007APART
DetailsForrest France
OH fire sprinklers are good for cover at the east elevator lobby roulon ceiling 5th floor as circled on approved resubmittals.
INSP-Sprinkler Rough-in8/8/20078/8/20078/8/2007PCANC
DetailsTroy Cobbley
Not enough time to perform inspection today. Rick said he would reschedule
INSP-Sprinkler Rough-in8/3/20078/6/20078/6/2007APASS
DetailsTroy Cobbley
See the city approved plans for the locations where sprinkler piping can be covered on the second and fourth floors.
INSP-Sprinkler Rough-in7/30/20077/31/20077/31/2007APASS
DetailsTroy Cobbley
See the city approved plans for locations where piping isok to cover.
INSP-Sprinkler Rough-in7/26/20077/27/20077/27/2007APASS
DetailsTroy Cobbley
See the third floor city approved drawings for the piping that is ok to cover.
INSP-Sprinkler Rough-in7/24/20077/24/20077/24/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the sprinkler piping that is ok to cover on the second floor north tower corridor.
INSP-Sprinkler Rough-in/Hydro7/19/20077/20/20077/20/2007APASS
DetailsTroy Cobbley
The hydro test of the east and west systems of the second floor has passed.
INSP-Sprinkler Rough-in/Hydro7/18/20077/19/20077/19/2007APASS
DetailsTroy Cobbley
The remaining areas of the central tower 2nd floor are ok to cover.
INSP-Sprinkler Rough-in/Hydro7/17/20077/17/20077/17/2007PPASS
DetailsTroy Cobbley
Above ground hydro test of the west half of the first floor system passed.
INSP-Sprinkler Rough-in7/12/20077/13/20077/13/2007APASS
DetailsTroy Cobbley
See the city approved plans for additional areas on the second floor where piping is ok to cover.
INSP-Sprinkler Rough-in7/11/20077/12/20077/12/2007APASS
DetailsTroy Cobbley
The 2" fill line to the secondary storage tank was flushed. Also see the city approved plans for corridors and rooms on the second floor and first floor where piping is ok to cover. I also looked at the piping that will be above the Rulon ceiling in the first floor elevator lobby but did not give the ok to cover since this area has been resubmitted.
INSP-Sprinkler Rough-in7/6/20077/9/20077/10/2007APASS
DetailsTroy Cobbley
Underground fill line to the secondary storage tank is ok to cover.
INSP-Sprinkler Rough-in/Hydro7/2/20077/2/20077/2/2007PPASS
DetailsTroy Cobbley
The sprinkler piping above the second floor elevator lobby rulon ceiling is ok to cover
INSP-Sprinkler Rough-in6/28/20076/28/20076/29/2007PPASS
DetailsTroy Cobbley
The secondary water supply discharge piping is ok to rebury. Overall 3' of pipe has been added with the same fittings. This work was done due to a new column has been added.
INSP-Sprinkler Rough-in6/19/20076/19/20076/20/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the location on the second floor and third floor where piping is ok to cover. It appears all of the pendant heads installed in the restrooms have been painted and will need replaced.
INSP-Sprinkler Rough-in6/15/20076/18/20076/18/2007APASS
DetailsTroy Cobbley
See the city approved plans for the piping above the hardlids on the 9th floor which is ok to cover.
INSP-Sprinkler Rough-in6/13/20076/13/20076/14/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the areas where piping can be covered.
INSP-Sprinkler Rough-in6/12/20076/12/20076/12/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the 1st and 2nd floor areas that the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in6/6/20076/6/20076/6/2007PPASS
DetailsTroy Cobbley
See the city approved plans for areas where piping is ok to cover
INSP-Sprinkler Rough-in5/30/20075/31/20075/31/2007APASS
DetailsTroy Cobbley
The sprinkler piping in the second floor, south tower, ASU restrooms are ok to cover
INSP-Sprinkler Rough-in5/22/20075/23/20075/23/2007APART
DetailsForrest France
The first floor lobby grid ceiling areas next to the donor walls are approved for cover, noted two heads spaced beyond max. allowabe distance- contractor to relocate one head to eliminate this problem.
INSP-Sprinkler Rough-in/Hydro5/15/20075/16/20075/16/2007APART
DetailsForrest France
Hydrostatic testing for the NW standpipe completed satisfactory, also approved for cover the 2nd floor mezzanine and 1st floor lobby grid ceiling areas as red lined and initialed on stamped plans.
INSP-Sprinkler Rough-in5/10/20075/11/20075/11/2007APASS
DetailsTroy Cobbley
The remaining hardlids on the eigth floor are ok to cover. Also the piping under the first floor stairs is ok to cover
INSP-Sprinkler Rough-in5/9/20075/10/20075/10/2007APASS
DetailsTroy Cobbley
Mission Corridor sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro5/7/20075/8/20075/9/2007APASS
DetailsTroy Cobbley
Basement of the central tower hydro test passed.
INSP-Sprinkler Rough-in5/3/20075/4/20075/4/2007APASS
DetailsTroy Cobbley
See the city approved plans for piping located in the basement and the eighth floor that is ok to cover.
INSP-Sprinkler Rough-in/Hydro4/26/20074/27/20074/27/2007APASS
DetailsTroy Cobbley
See the city approved plans for the location at the main entrance where the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in4/25/20074/26/20074/27/2007ACANC
DetailsTroy Cobbley
Inspection is to be rescheduled
INSP-Sprinkler Rough-in4/18/20074/18/20074/18/2007PPASS
DetailsTroy Cobbley
See city approved plans for areas on the eigth floor where the sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in4/12/20074/13/20074/13/2007APASS
DetailsTroy Cobbley
The sprinkler piping above the ceiling in Mission Spec. is ok to cover. Also the piping above the outside main canopy is ok to cover
INSP-Sprinkler Rough-in/Hydro3/27/20073/28/20073/28/2007APART
DetailsForrest France
Fire sprinklers are approved for cover at the 1st floor chapel and chaplains office, also reinspected 5th floor RR which was missing a head and one hanger at an arm-over above a hard lid.
INSP-Sprinkler Rough-in3/22/20073/23/20073/23/2007APASS
DetailsTroy Cobbley
See the city approved plans for first floor and fifth floor areas where the piping is ok to cover
INSP-Sprinkler Rough-in3/15/20073/16/20073/16/2007APASS
DetailsTroy Cobbley
See the city approved plans for the location where the piping on the third floor is not ok to cover. All other areas on the third floor are ok to cover
INSP-Sprinkler Rough-in3/8/20073/8/20073/8/2007PPASS
DetailsTroy Cobbley
see the city approved plans for locations on the 3rd floor that are ok to cover
INSP-Sprinkler Rough-in3/2/20073/5/20073/5/2007APASS
DetailsTroy Cobbley
See the city approved plans for locations of piping above hardlids that is approved for cover
INSP-Sprinkler Rough-in3/1/20073/2/20073/2/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the piping above the 5th floor hardlids that is ok to cover.
INSP-Sprinkler Rough-in2/22/20072/23/20072/23/2007APASS
DetailsTroy Cobbley
9th floor sprinkler rough-in passed.
INSP-Sprinkler Rough-in2/20/20072/21/20072/21/2007APASS
DetailsTroy Cobbley
See the city approved plans for locations where the piping above hardlids is ok to cover.
INSP-Sprinkler Rough-in2/8/20072/8/20072/9/2007PPASS
DetailsTroy Cobbley
The remaining south half of the 8th floor sprinkler system rough-in passed. Drops will still need to be inspected.
INSP-Sprinkler Rough-in1/31/20072/1/20072/1/2007APART
DetailsTroy Cobbley
See the city approved plans for the portion of the 8th floor that rough-in has passed.
INSP-Sprinkler Rough-in1/29/20071/29/20071/29/2007PPASS
DetailsTroy Cobbley
See city approved plans for piping on the first floor that is ok to cover.
INSP-Sprinkler Rough-in1/24/20071/25/20071/25/2007APASS
DetailsTroy Cobbley
Sprinkler piping in operating rooms 5 through 12 are ok to cover. Also see plans for piping above hardlids in lobby that is ok to cover as well.
INSP-Sprinkler Rough-in1/23/20071/24/20071/24/2007APART
DetailsForrest France
Overhead fire sprinkler is approved for cover at operating rooms 2, 3, and 4, second floor as marked on approved plans.
INSP-Sprinkler Rough-in1/5/20071/8/20071/8/2007APASS
DetailsTroy Cobbley
See city approved plans for additional areas where the piping located above hardlids can be covered on the 2nd, 3rd and 4th floors.
INSP-Sprinkler Rough-in1/4/20071/5/20071/5/2007APASS
DetailsTroy Cobbley
The sprinkler piping above the remaining hardlids on the fourth floor is ok to cover and the remaining piping on the fifth floor that needed a rough-in inspection has passed.
INSP-Sprinkler Rough-in12/19/200612/19/200612/19/2006PPASS
DetailsTroy Cobbley
Piping located in the folding door pockets in the auditorium is ok to be covered.
INSP-Sprinkler Rough-in12/12/200612/12/200612/12/2006PPASS
DetailsTroy Cobbley
Pendants located in the soffets in auditorium are ok to cover.
INSP-Sprinkler Rough-in12/11/200612/11/200612/11/2006PPASS
DetailsTroy Cobbley
Flow of the most remote standpipe passed. Actual flow was 1,292 gallons.
INSP-Alarm Testing12/8/200612/11/200612/11/2006PCANC
DetailsTroy Cobbley
Wrong type of inspection called in.
INSP-Sprinkler Rough-in/Hydro11/29/200611/30/200611/30/2006APASS
DetailsTroy Cobbley
The hydro test for the north tower 6th floor mechanical area is passed.
INSP-Sprinkler Rough-in11/29/200611/29/200611/29/2006PPASS
DetailsTroy Cobbley
See the city approved plans for the piping that has been marked as inspected with todays date. This inspection was not for any drops or armovers. Three hangers had been taken off and will need to be re-installed. They have been marked on the prints.
INSP-Sprinkler Rough-in11/28/200611/28/200611/28/2006PPASS
DetailsTroy Cobbley
See city approved plans for locations on 4th floor where piping is ok to cover in the hardlid areas.
INSP-Sprinkler Rough-in11/27/200611/27/200611/27/2006PPASS
DetailsTroy Cobbley
See city approved plans for locations in the basement that the ceiling tile can be installed.
INSP-Sprinkler Rough-in11/20/200611/20/200611/20/2006PPASS
DetailsTroy Cobbley
See city approved plans for locations/rooms where piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro11/9/200611/13/200611/13/2006APASS
DetailsTroy Cobbley
Standpipe hydro test passed.
INSP-Sprinkler Rough-in/Hydro11/8/200611/8/200611/8/2006PDONE
DetailsForrest France
Duplicate inspection request for an AG hydrostatic test of the 1st floor east wing which passed.
INSP-Sprinkler Rough-in11/2/200611/3/200611/3/2006APART
DetailsForrest France
OH rough-in at the 1st floor north tower corridor is okay to cover.
INSP-Sprinkler Rough-in/Hydro10/30/200610/31/200610/31/2006APART
DetailsForrest France
Inspection for overhead cover at the drop ceilings in the 1st floor corridor to the north tower and the hard lid on the 3rd floor stair tower #4 landing are acceptable for cover.
INSP-Sprinkler Rough-in/Hydro10/23/200610/24/200610/24/2006APASS
DetailsTroy Cobbley
Rough-in for the standpipe in stairwells #2 and #4 passed
INSP-Sprinkler Rough-in10/20/200610/20/200610/20/2006PPASS
DetailsTroy Cobbley
See the city approved plans for areas on the first floor that are ok for ceiling installation.
INSP-Sprinkler Rough-in/Hydro10/10/200610/10/200610/10/2006PPASS
DetailsTroy Cobbley
Inspection was for the covering of sprinkler piping in the basement, second and third floors. See city approved plans for locations..
INSP-Sprinkler Rough-in/Hydro9/28/200610/5/200610/6/2006APASS
DetailsTroy Cobbley
Witnessed fire pump certification by the manufacturer
INSP-Sprinkler Rough-in10/2/200610/3/200610/3/2006APASS
DetailsTroy Cobbley
See city approved plans for locations of the sprinkler piping that is ok to cover
INSP-Sprinkler Rough-in10/2/200610/2/200610/2/2006PFAIL
DetailsTroy Cobbley
Inspected east area of the first floor. Ok to cover when the fire alarm wire has been removed from the sprinkler piping.
INSP-Sprinkler Rough-in/Hydro9/12/20069/12/20069/12/2006PPART
DetailsTroy Cobbley
Rough in Inspection for the remaining areas of the 4th floor new tower is passed except for there are numerous areas where the hangers and piping have been removed by other contractors. Prior to final rough-in being passed another inspection will be required to verify everything has been corrected.
INSP-Sprinkler Rough-in9/6/20069/6/20069/6/2006PPASS
DetailsTroy Cobbley
See the city approved plans for the portion of the 4th floor rough-in that was inspected and passed today
INSP-Sprinkler Rough-in9/5/20069/5/20069/5/2006PPASS
DetailsTroy Cobbley
The pendant sprinkler piping in the corridor in the basement that connects the mechanical room to the south tower is ok to cover. The third floor east stair tower piping above the ceiling is ok to cover.
INSP-Sprinkler Rough-in8/29/20068/30/20068/30/2006PPASS
DetailsTroy Cobbley
forward flow test passed
INSP-Sprinkler Rough-in/Hydro8/29/20068/29/20068/29/2006PPASS
DetailsTroy Cobbley
Hydro test of the west standpipe passed and can be covered in the first floor and basement walls.
INSP-Sprinkler Rough-in/Hydro8/28/20068/28/20068/28/2006PPART
DetailsTroy Cobbley
Hydro tests for the supply and basementt passed except for the standpipe
INSP-Sprinkler Rough-in/Hydro8/25/20068/25/20068/25/2006PPART
DetailsTroy Cobbley
All of the hydro tests failed except for the fdc piping
INSP-Sprinkler Rough-in/Hydro8/21/20068/22/20068/22/2006APASS
DetailsTroy Cobbley
Sprinkler piping in the fire command center is ok to cover.
INSP-Supply line flush8/21/20068/22/20068/22/2006APASS
DetailsTroy Cobbley
Underground flush passed.
INSP-Sprinkler Rough-in/Hydro8/18/20068/21/20068/21/2006APASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Sprinkler Rough-in8/11/20068/14/20068/14/2006APASS
DetailsTroy Cobbley
Third floor rough-in passed. Still need to have the arm overs inspected before coverup.
INSP-Sprinkler Rough-in8/10/20068/11/20068/11/2006PPASS
DetailsTroy Cobbley
Rough-in for the branchline and main piping is now complete in the basement and first floors. The areas in question were addressed in the resubmittals. A rough-in inspection was done for the second floor main and branchline piping which passed. Armovers will still need to be inspected prior to cover up in basement, first and second floors.
INSP-Sprinkler Rough-in8/8/20068/9/20068/9/2006APASS
DetailsTroy Cobbley
Breakdown room is ok to cover
INSP-Sprinkler Rough-in8/3/20068/3/20068/3/2006PPART
DetailsForrest France
UG connection for remote FDC passed inspection for cover.
INSP-Sprinkler Rough-in7/20/20067/20/20067/21/2006PPASS
DetailsTroy Cobbley
Witnessed the secondary water supply tank sitting in the hole in the ground and inspected piping about hard lids. I marked locations on plans.
INSP-Sprinkler Rough-in7/14/20067/14/20067/14/2006PPASS
DetailsTroy Cobbley
The piping above the hardlids as marked on the 2nd and 3rd floor plans is ok to cover.
INSP-Sprinkler Rough-in7/11/20067/11/20067/11/2006PPASS
DetailsTroy Cobbley
The 8" city supply underground for the project is ok to cover. The two 8" elbows did not need to be installed.
INSP-Sprinkler Rough-in7/5/20067/5/20067/5/2006PPASS
DetailsTroy Cobbley
The sprinkler hangers located in the mechanical penthouse of the north tower are ok to cover with fire proofing.
INSP-Supply line flush6/29/20066/29/20066/29/2006PPART
DetailsTroy Cobbley
Inspection was not for a flush but for a partial cover inspection of the underground. One length of underground piping as installed is ok to cover. It extends from the existing tap to the base of the column.
INSP-Conference6/27/20066/27/20066/28/2006PDONE
DetailsTroy Cobbley
Request was for pendant heads only to be installed below a retardant treated wood slat ceiling in the elevator lobbies. This request has been approved upon review of Bill Alexander and the building plan reviewer. I conveyed this message to the field installer.
INSP-Sprinkler Rough-in6/22/20066/22/20066/22/2006PPASS
DetailsTroy Cobbley
west half of the 2nd floor rough-in is passed. Inspection for arm-overs will need to be done.
INSP-Sprinkler Rough-in6/13/20066/13/20066/13/2006PPASS
DetailsTroy Cobbley
Third floor sprinkler piping, except areas as marked on the plans, rough-in inspection has passed. Will need to be reinspected for hangers on arm overs prior to cover up.
INSP-Sprinkler Rough-in6/5/20066/5/20066/6/2006PCANC
DetailsTroy Cobbley
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
INSP-Sprinkler Rough-in5/31/20065/31/20065/31/2006PCANC
DetailsTroy Cobbley
To be rescheduled
INSP-Sprinkler Rough-in5/16/20065/17/20065/17/2006APASS
DetailsTroy Cobbley
The east half of the tower basement rough-in passed. Also the standpipe passed. Some piping has not been installed yet and is marked as such on the plans. Ceiling have not been installed which means arm overs will need to be inspected prior to coverup.
INSP-Sprinkler Rough-in5/15/20065/15/20065/15/2006PPART
DetailsTroy Cobbley
Inspection was for the basement of the new tower. Area inspected today was the west half of the basement. Some minor items have been found. See approved plans for locations.the east half of the system and all of the 6" standpiping needs inspected.
INSP-Sprinkler Rough-in4/12/20064/13/20064/13/2006APASS
DetailsTroy Cobbley
Hangers on third floor connecting corridor are ok.
INSP-Sprinkler Rough-in3/28/20063/28/20063/28/2006PPART
DetailsTroy Cobbley
See city approved plans for exact locations approved for rough-in and locations of corrections. Hangers on end lines need to have hangers prevent the upward movement of the sprinkler piping due to pressures in excess of 100psi. Also plans need to be resubmitted with corrections per the review comments.
FIR-Aging Inspection12/9/200512/9/200512/12/2005 NR
DetailsTroy Cobbley
Work is in progress