Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00562
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8633 W FRANKLIN RD
Project NameSPR MICHAELS ARTS & CRAFT
Customer Number 
ePlanReview 
Description
MICHAELS THE ARTS & CRAFTS STORE (ADDITION AND REMODEL) - To modify and expand an existing fire sprinkler system into a new 7,650-ft/2, one story, addition on the east end of the existing Franklin Towne Plaza IV building. This addition is for the expansion of the existing Michaels Arts & Crafts tenant space. This includes the removal of two existing small entry vestibules and the construction of one new larger entry vestibule, the addition of a new 390-ft/2 classroom and a new office, cash room to the north east wall of the new expansion and add a new 800-ft/2 framing room at the southwest area of the retail space. The new building area with the addition is 51,750-ft/2, first floor 38,690-ft/2, second floor 13,060-ft/2. NOTE: The entire Franklin Towne Plaza IV building is considered one building. The sprinkler system is used for area increase. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-00627.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/15/20062/17/20062/17/2006APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection2/14/20062/15/20062/15/2006PFAIL
DetailsTroy Cobbley
Need to forward flush the backflow preventor and install one additional hanger at the front entrance.
INSP-Final Inspection2/1/20062/2/20062/2/2006AFAIL
DetailsTroy Cobbley
Need to provide review comments. Need to finish work work at the entrance. It appears one sprinkler needs to be added outside of the entry way. Provide spare heads and head wrench. Provide rest of ceiling tile in the framing room. Provide additional hydraulic stickers for new remote areas at the riser. Verify that the existing backflow does or does not need to be forward flushed to verify the new/higher flow rate of the storage area.
INSP-Final Inspection11/14/200511/15/200511/15/2005APART
DetailsTroy Cobbley
Could not give final with no ceiling. Piping in and around the new framing room is ok to cover
INSP-Final Inspection10/14/200510/14/200510/14/2005PFAIL
DetailsForrest France
Approved resubmitted plans are not available for inspection or verification of compliance.
INSP-Final Inspection10/13/200510/13/200510/13/2005PPART
DetailsTroy Cobbley
Deficiencies for the 6" tie in have been corrected.
INSP-Sprinkler Rough-in10/12/200510/13/200510/13/2005AFAIL
DetailsTroy Cobbley
Inspection was for the 6" main. Need to fire caulk around the penatration to the fire riser room, provide additional clearance at thepenatrationthrough the CMU wall and provide a 4 way brace at the top of the 6" rise up piece in the future stock room.
INSP-Sprinkler Rough-in/Hydro10/10/200510/10/200510/10/2005PFAIL
DetailsTroy Cobbley
Can not do a final as the sprinkler plans need to be resubmitted. Sprinkler piping is ok to cover in the new area.
INSP-Final Inspection10/10/200510/10/200510/10/2005PFAIL
DetailsTroy Cobbley
Can not do a final as the sprinkler plans need to be resubmitted. Sprinkler piping is ok to cover in the new area.