Permit Information
Permit NumberFIR05-00570
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1487 S DAVID LN
Project NameSPR INS NETWORK AMERICA
Customer Number 
ePlanReview 
Description
INSURANCE NETWORK AMERICA OFFICE BUILDING - To install a complete overhead and combustible cavity fire protection system in a new 7,800-ft/2, one story wood framed office building. The underground fire service supply lead-in was installed under FIR05-00460. All fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-01669.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/3/20063/3/20063/3/2006PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/16/20062/16/20062/16/2006PPART
DetailsForrest France
The following items remain for final, need to provide for requirements of note #24 on plan review comments regarding one hour riser room construction or PIV installation, perform the forward flow test for the backflow prevention device, provide and attatch hydraulic calc. sticker to the riser.
INSP-Sprinkler Rough-in/Hydro2/9/20062/10/20062/10/2006APART
DetailsForrest France
Hydrostatic test of the overhead fire sprinkler passed.
INSP-Sprinkler Rough-in12/2/200512/5/200512/5/2005APART
DetailsForrest France
Verified the unsprinklered cavity at the west dormer has been completely filled with noncombustible insulation per the exception of NFPA 13 8.14.1.2.7. Overhead rough-in is good for cover.
INSP-Sprinkler Rough-in/Hydro11/18/200511/18/200511/18/2005PPART
DetailsForrest France
Overhead fire sprinkler rough-in is okay to cover pending verification of coverage for the dormer at the west roof that is not currrently protected, also will need to verify no obstructions develop after the insulation is installed at the roof.