Permit Information
Permit NumberFIR05-00594
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 950 W BANNOCK ST
Project NameSPR 10TH & BANNOCK PHASE 1
Customer Number 
ePlanReview 
Description
10TH & BANNOCK BUILDING (SHELL & CORE ) - To install 2 connected underground sealed concrete reservoir (4,678 gpm & 10,322 gpm) tanks connected with a combined capacity of 15,000 gallons (13,800 usable), a 4" fill line with related operating equipment/devices and appurtenance, one 125 hp, 750 gpm (457 rated head) at 225 psi, 9 stage Electric Vertical Shaft Turbine Fire Pump and a 3 hp Vertical In-line Jockey pump w/controller packages, a wet Automatic Class 1 standpipe system in the east and west stairwells (w/east the stairs incorporating a combination sprinkler/standpipe floor zone wet system piping and appurtenance), 1st floor wet zone system and an anti-freeze system for the Drive-Thru. All installed in a new 182,950-ft/2, twelve story concrete and steel framed office and retail, w/parking, high rise shell and core building. This is permitted work is attached to the shell and core building only and no occupancy is allowed under this permit. Underground fire service supply is constructed under FIR05-00349 (attached under the same shell building permit). All fire sprinkler tank, underground, overhead standpipe and related work shall comply with the IFC-2003, NFPA 13-2002, 14-2003, 20-2002, 22-2003, 24-2002, the attached review comments/conditions list, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this permitted work, to provide witness of compliance verification of meeting minimum code. This permit is attached to building permit: BLD05-02348.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/28/20064/28/20064/28/2006PPASS
DetailsForrest France
Fire sprinkler passed final inspection, permit finaled.
INSP-Final Inspection4/24/20064/24/20064/24/2006PPART
DetailsForrest France
Need to remove "construction caps" at the pendent heads in the showers on the 1st floor, install missing escutcheons at some locations.
INSP-Final Inspection4/17/20064/18/20064/18/2006PFAIL
DetailsForrest France
Stairway sprinklers must be installed per NFPA 13 2002 8.14.3.2.1.
INSP-Final Inspection4/14/20064/17/20064/17/2006ADEFR
DetailsForrest France
Inspection rescheduled
INSP-Sprinkler Rough-in4/6/20064/6/20064/6/2006PPART
DetailsForrest France
The 11th floor overhead rough-in is good for cover at the drop ceiling areas.
INSP-Sprinkler Rough-in4/4/20064/4/20064/4/2006PPART
DetailsForrest France
Performed standpipe flow test as required.
INSP-Sprinkler Rough-in3/30/20063/31/20063/31/2006APASS
DetailsTroy Cobbley
sprinkler piping in the lower ceilings on the first floor are ok to cover. See city approved plans for locations . The west side lower ceiling has a lower soffit that will require an additional sprinkler head to provide proper coverage. Also marked on plans.
INSP-Sprinkler Rough-in/Hydro3/28/20063/29/20063/29/2006PPART
DetailsForrest France
Hydrostatic test of the overhead wet, antifreeze, and standpipe systems is satisfactory, noted one head at the mezzanine stair landing is painted, head cage is missing at head under mezz ductwork, inspected the 5th and 6th floors for cover, the mech penthouse, 11th floor, and portions of the 1st floor are not inspected for cover at this time, discussed items left for completion at the riser room and final testing including standpipe flow test, forward flow of BFP and related sprinkler alarms.
INSP-Sprinkler Rough-in3/24/20063/28/20063/28/2006APART
DetailsForrest France
Pump start-up testing performed with manufacturer rep. including churn, rated and 150 percent capacity, manual and automatic starts and stops, jockey pump, set pressures, event log, min. run time, sensing lines, piping arrangements. Performance testing only, no alarm, trouble or supervised conditions tested at this time.
INSP-Sprinkler Rough-in3/22/20063/27/20063/27/2006PPART
DetailsForrest France
Overhead rough-in is good for cover on floors 10, 9, 8, and 7. Partial inspection of floor 5 as ceiling grid is not complete. Floor 6 and 11 not ready for cover inspection at this time. Also concluded satisfactory 72 hr hydro test of the UG tanks as water level did not drop.
INSP-Sprinkler Rough-in3/23/20063/24/20063/24/2006PPART
DetailsForrest France
Begin 72hr test of the water level at the underground storage tanks.
INSP-Sprinkler Rough-in3/16/20063/17/20063/17/2006PPART
DetailsForrest France
Third and fourth floor overhead rough-in is acceptable for cover.
INSP-Sprinkler Rough-in3/14/20063/15/20063/15/2006APART
DetailsForrest France
Core areas including the restrooms,elevator lobby, and janitors closet on the 7th-11th floors inspected for rough-in cover, 2nd and 1st floors rough-in is good for cover, one head in the ATM room is blocked by ductwork, discussed hydro testing schedule.
INSP-Supply line flush3/13/20063/14/20063/14/2006ADEFR
DetailsForrest France
This inspection request was intended for an UG supply line flush under project related permit FIR05-00395-contractor called in the wrong permit number (for overhead), flush was witnessed and performed satisfactory.
INSP-Sprinkler Rough-in/Hydro2/28/20063/1/20063/1/2006APART
DetailsForrest France
Overhead rough-in is good for cover at the 2nd thru 6th floor core areas including restrooms, elevator lobby, janitors closets, tele rooms and electrical rooms, discussed inspection method for the common floor areas, also inspected corridors and adjacent meeting rooms at the 2nd floor.
INSP-Sprinkler Rough-in/Hydro2/27/20062/28/20062/28/2006PCANC
DetailsForrest France
Inspection to be rescheduled due to time constraints.
INSP-Sprinkler Rough-in2/13/20062/14/20062/14/2006ADONE
DetailsForrest France
On site confrence to discuss location of the penthouse mechanical room standpipe hose connections.
INSP-Sprinkler Rough-in2/13/20062/13/20062/13/2006PCANC
DetailsForrest France
Inspection was intended for the UG rough-in under a different permit.
INSP-Supply line flush2/10/20062/10/20062/13/2006PNR
DetailsForrest France
Per contractor, not ready for inspection, to be rescheduled for next week.
INSP-Sprinkler Rough-in2/9/20062/9/20062/10/2006PFAIL
DetailsTroy Cobbley
Inspection was for the lining of the tank. Provide access to the interior of the tank for inspection
INSP-Sprinkler Rough-in2/3/20062/6/20062/6/2006APART
DetailsForrest France
First floor entry lobby hard lid area inspection only, acceptable to cover at this location only. The 1 1/4 branch line to feed the elevator pit sprinklers has not been installed.
INSP-Sprinkler Rough-in1/12/20061/12/20061/12/2006PPART
DetailsForrest France
Inspected four restrooms on the first floor for overhead rough-in cover.
INSP-Sprinkler Rough-in1/4/20061/4/20061/4/2006PPART
DetailsForrest France
Inspection for rough-in at 2nd floor hard lid area, sprinklers at ceiling pocket areas must comply with the requirements of note #137 on plan review documents. The updated approved resubmitted plans are required for future overhead inspection requests.