Permit Information
Permit NumberFIR05-00601
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 6043 W PORT LN
Project NameSPR ELDORADO 4-PLEX #18
Customer Number 
ePlanReview 
Description
ELDORADO 4-PLEX BLDG #18 * To install a fire life safety NFPA 13R system to prevent flashover (total involvement) in the room of fire origin, where sprinklered, and to improve the chance for occupants to escape or be evacuated, in a new 3,804-ft/2 two story, four unit apartment building starting at the top of a 2" Watts Series 007 Backflow Double Check control. An NFPA 13R fire sprinkler protection system is required for compensation for the lack of Fire Department access per 503.1.1, Exception 1. System shall be equipped with an alarm initiating device connected to an alarm system and an outside annunciating devise. All fire sprinkler work and related, which includes dual service underground water supply, the system backflow prevention device (provided by others), shall be per NFPA 13R, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD05-01374.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/27/20061/27/20061/27/2006PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/21/200512/21/200512/21/2005PCANC
DetailsTroy Cobbley
contact; Matt - Final; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro11/18/200511/18/200511/18/2005PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover. Superintendant witnessed the hydro test and it supposedly passed. Will need to get the test cert. Wrong backflow preventor has been installed and will need verification the one that is installed will work.
INSP-Supply line flush10/31/200511/1/200511/1/2005APASS
DetailsTroy Cobbley
underground flush passed.
INSP-Sprinkler Rough-in/Hydro10/27/200510/28/200510/28/2005PFAIL
DetailsTroy Cobbley
Piping as installed does not match plans. Wall layout does not match plans. Additional 90's and Tee's have been installed including in the remote area and piping has been rerouted. Heads have been deleted in restrooms but added in area immediately outside of the restrooms. Wall layout has changed. Resubmit updated plans for approvals.