INSP-Final Inspection | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been verified for completion, inspection passed, permit finaled.
|
INSP-Final Inspection | 6/26/2006 | 6/26/2006 | 6/27/2006 | P | FAIL |
Forrest France
|
|
|
Need to replace one defective SW head at the garage area, repair leaking main drain connection, provide spare SW in head box.
|
INSP-Sprinkler Rough-in/Hydro | 1/20/2006 | 1/23/2006 | 1/23/2006 | A | PART |
Forrest France
|
|
|
Two areas as noted lack proper tenting, one head in the sauna room is not installed at this time, two heads have been added below the stairs adjacent to the riser, riser not complete, discussed coverage of the heating unit for the sauna, overhead rough-in is acceptable for cover as noted.
|
INSP-Sprinkler Rough-in | 1/19/2006 | 1/20/2006 | 1/20/2006 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today, to be rescheduled for next week per conversation with contractor.
|