Permit Information
Permit NumberFIR05-00644
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 7957 W SPECTRUM ST
Project NameSPR HOMEWOOD SUITES
Customer Number 
ePlanReview 
Description
(HOMEWOOD SUITES-HILTON HOTEL) To install a complete overhead fire sprinkler system consisting of a Class 1 manual standpipe system, one wet and two dry pipe systems, all connected to an underground supply permitted under FIR05-00509, in a new 102,196-ft/2, 4-story (with combustible attic cavities), wood framed, 110 guest room extended stay hotel with a restaurant, lodge area, indoor swimming pool and spa area. This facility has horizontal exits on each floor required for travel distance to the required exits. This building requires full fire sprinkler protection (NFPA 13 System) for area increase. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-02035.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/7/20072/9/20072/9/2007PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/31/20072/1/20072/1/2007AFAIL
DetailsTroy Cobbley
No time to finish the sprinkler inspection today. The interconnection of the sprinkler devices with the fire alarm system passed. Both dry system have been trip tested. The first floor took 24 seconds for water to get to the inspectors test and the fourth floor took 41 seconds.
INSP-Sprinkler Rough-in/Hydro1/30/20071/31/20071/31/2007APASS
DetailsTroy Cobbley
24 hour air tests for both the dry systems has passed.
INSP-Sprinkler Rough-in/Hydro1/29/20071/30/20071/30/2007APASS
DetailsTroy Cobbley
The standpipe hydro test passed. Started the 24 hour air tests on both dry systems at 9:30. The 4th floor is at 45psi and the front system is at 47psi.
INSP-Sprinkler Rough-in/Hydro1/25/20071/26/20071/26/2007PPASS
DetailsTroy Cobbley
Hydro test passed. Still need to hydro test the standpipes and 24 hour tests for the dry systems.
INSP-Sprinkler Rough-in/Hydro1/11/20071/12/20071/12/2007APASS
DetailsTroy Cobbley
hydro test for the 1st, 2nd, 3rd and 4th floors has passed.
INSP-Conference11/16/200611/17/200611/17/2006APASS
DetailsTroy Cobbley
The conference was for the eaves. The eaves will have blown-in insulation and cardboard has been utilized to provide the necessary eave ventilation. Appears acceptable.
INSP-Conference10/27/200610/30/200610/30/2006ADONE
DetailsTroy Cobbley
I discussed combustible concealed space requirements with the fire sprinkler contractor and the builder
INSP-Conference10/12/200610/13/200610/13/2006ADONE
DetailsTroy Cobbley
fire place and the stairwell combustible concealed spaced have been filled with insulation and sheetrocked. I went over the combustible eaves with both the fire sprinkler contractor and the general contractor
INSP-Sprinkler Rough-in10/11/200610/12/200610/12/2006APASS
DetailsTroy Cobbley
The club house branchline piping located below the hard lids but above the lay ceiling passed. Prior to cover the armovers will need to be inspected. I notified the sprinkler contractor that the fireplace area and the stairwells will need to be opened up for verification that the combustible areas have met the exceptions as stated in NFPA 13 for areas not requiring sprinklers. Another potential problem are the combustible eave pockets.
INSP-Conference9/20/20069/20/20069/20/2006PDONE
DetailsTroy Cobbley
Contractor is installing fire resistant wood in the areas above the lobby ceiling. Hardlid is ok to cover.
INSP-Sprinkler Rough-in9/18/20069/18/20069/18/2006PFAIL
DetailsTroy Cobbley
Piping as installed is ok in main lobby area but wood has been installed above the ceiling. Do not cover piping until combustibles have been addressed.
INSP-Sprinkler Rough-in8/31/20069/1/20069/1/2006APART
DetailsForrest France
OH rough-in for the drop ceiling area above the pool as marked on approved plans is acceptable for cover.
INSP-Sprinkler Rough-in7/21/20067/24/20067/24/2006APASS
DetailsTroy Cobbley
The east half of the first floor is ok to cover. I also inspected the concealed pockets in the room entry ways and verified that they are indeed noncombustible.
INSP-Sprinkler Rough-in7/13/20067/14/20067/14/2006APASS
DetailsTroy Cobbley
North half of the first floor piping is ok to cover
INSP-Sprinkler Rough-in7/5/20067/5/20067/6/2006PPASS
DetailsTroy Cobbley
Pool area and lobby area dry system ok to cover. Combustible concealed eave spaces as marked on the plans for these same areas will need to be addressed prior to final
INSP-Sprinkler Rough-in6/29/20066/30/20066/30/2006PPART
DetailsTroy Cobbley
Rough-in for the pool/clubhouse area is mostley passed. See approved plans for areas needing corrections. Branchlines have been added in areas not provided with protection. As-builts will need to be provided prior to cover. Combustible pockets still need protection. Branchlines in peak are too far down from the peak
INSP-Sprinkler Rough-in6/26/20066/27/20066/27/2006APASS
DetailsTroy Cobbley
2nd floor sprinkler piping ok to cover.
INSP-Sprinkler Rough-in6/23/20066/26/20066/26/2006AFAIL
DetailsTroy Cobbley
Pendant heads are still not spaced as discussed on the second floor. Sprinkler piping in the swimming area is not sized per plans and the upright sprinktler heads are not spaced per approved plans.
INSP-Sprinkler Rough-in6/23/20066/23/20066/23/2006PFAIL
DetailsTroy Cobbley
Almost all of the residence rooms have a single pendant head that is blocked by the stub wall. All of these pendants need to be relocated to be positioned as shown on the plans.
INSP-Sprinkler Rough-in6/14/20066/15/20066/15/2006APASS
DetailsTroy Cobbley
Fourth floor sprinkler piping is ok to cover. Some sidewall sprinkler heads are real close to being out of code compliance in regards to deflector distance from the ceiling, especially the heads in the mechanical closets in each room. Mark and I agreed these would be checked once the sheet rock patching was complete.
INSP-Sprinkler Rough-in6/6/20066/6/20066/6/2006PPASS
DetailsTroy Cobbley
The east wing of the 3rd floor is ok to cover.
INSP-Sprinkler Rough-in6/1/20066/2/20066/2/2006APASS
DetailsTroy Cobbley
The north wing of the third floor cpvc piping is ok to cover.
INSP-Sprinkler Rough-in6/1/20066/1/20066/1/2006PFAIL
DetailsTroy Cobbley
Inspection was for the north half of the 3rd floor which failed. there are multiple sprinkler heads and hangers overspaced. Inspection stopped.
INSP-Sprinkler Rough-in5/16/20065/17/20065/17/2006PPASS
DetailsTroy Cobbley
The remaining attic system passed rough-in inspection. Sprinkler coverage in the east catwalk area has been added and is being resubmitted for review. This work was not inspected
INSP-Sprinkler Rough-in4/28/20065/1/20065/1/2006APASS
DetailsTroy Cobbley
Per the sprinkler contractor the pockets behind the elevator shaft will be filled with insulation. Revised hydraulic calculations have been provided and field verified by me for the addition of one upright sprinkler head in the fourth floor attic system remote area. The new node point was 400. The north/south will is ok to cover. No inspection has been done on the east/west wing.
INSP-Sprinkler Rough-in4/26/20064/27/20064/27/2006APART
DetailsTroy Cobbley
Dry pipe system for the north wing has been inspected and passed for the most part. The areas of concern are: one sprinkler upright has been added in the remote area at the very north end which will require resubmittals and there is inadequate coverage above the elevator shaft.
INSP-Sprinkler Rough-in4/6/20064/7/20064/7/2006APASS
DetailsTroy Cobbley
The stand pipes have been converted to wet. but the riser still needs to be installed in its final configuration.
INSP-Supply line flush3/30/20063/31/20063/31/2006AFAIL
DetailsTroy Cobbley
Wrong permit number called in. See FIR05-00509 for entry.
INSP-Sprinkler Rough-in/Hydro3/30/20063/31/20063/31/2006AFAIL
DetailsTroy Cobbley
Wrong permit number called in. See FIR05-00509 for entry.
INSP-Sprinkler Rough-in3/15/20063/16/20063/16/2006APART
DetailsTroy Cobbley
The wet stand pipes have been installed as dry temporarily with dave hannimans approval. Signage with gpm and psi requirements have been placed at the fdc. The standpipes are to be converted to wet when the building is enclosed and heated. Work can now continue on the fourth floor and above.