INSP-Final Inspection | 3/2/2007 | 3/2/2007 | 3/2/2007 | P | PASS |
Forrest France
|
|
|
Items on correction notices field verified for compliance, fire sprinkler permit finaled.
|
INSP-Supply line flush | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | CANC |
Forrest France
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Victoria Beall brian cancelled 3:40
|
INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | FAIL |
Troy Cobbley
|
|
|
Forward flush of both backflow preventors passed. Still need to get letter stating it is ok to hang 6" main from a single truss
|
INSP-Final Inspection | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
Fire sprinkler work is not finished yet and updated plans are required.
|
INSP-Sprinkler Rough-in | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Forrest France
|
|
|
Tie-ins to existing system at the west office area are acceptable to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PART |
Forrest France
|
|
|
AG hydrostatic test of the west office area passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/29/2006 | 6/29/2006 | 6/29/2006 | P | PART |
Forrest France
|
|
|
OH rough-in at the west office area appears acceptable as installed, however the installation does not match approved plans and will require plans reflecting actual field installation prior to final.
|
INSP-Final Inspection | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | CANC |
Troy Cobbley
|
|
|
No time to complete inspection.
|
INSP-Final Inspection | 3/30/2006 | 4/3/2006 | 4/4/2006 | A | DEFR |
Forrest France
|
|
|
Inspection rescheduled.
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | CANC |
Forrest France
|
|
|
Per S. Rogers, no field inspection is to be performed until the required resubmitted plans are stamped/approved and on site for verification of code compliance.
|
INSP-Sprinkler Rough-in/Hydro | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the new 3" wet system at the office area is acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2006 | 3/2/2006 | 3/3/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be scheduled for 3/3 as discussed with contractor.
|
INSP-Sprinkler Rough-in/Hydro | 2/14/2006 | 2/14/2006 | 2/15/2006 | P | FAIL |
Forrest France
|
|
|
Head is overspaced in supply room 124 see NFPA 13 8.6.3.2.4 and 3.3.20, need the correct temp head installed in the server room within direct air flow of the unit heater, need to correct the 4-way EQ brace at 2" main, missing retaining strap at 1 1/4 branch line hanger, provide approved resubmittals reflecting changes showing added DP, changed room layouts, deleted closets, added heads at walls and new 2" line to added heads in the restrooms, rooms on the east side are covered and not inspected at this time, provide verification the exposed wood above the ceiling at the south end is treated, new office area only inspected for rough-in as marked on plans at this time.
|
INSP-Sprinkler Rough-in/Hydro | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the antifreeze system passed. The supply main connection for this area has been changed significantly from the approved plans- system is now fed off the dead end main of the adjacent gridded wet system, not the 3" wet main from the warehouse as shown, need to resubmit plans for approval of this change, an overhead door has also been installed at the adjacent storage area requiring a sw to be installed.
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2005 | 12/14/2005 | 12/15/2005 | P | FAIL |
Forrest France
|
|
|
The overhead hydrostatic test for the new refrigerated storage area passed, rough-in for this area needs flexible couplings installed where 6" main passes through the wall, verification that the 6" main can be supported by a single truss as installed, some upright heads are blocked by close proximity to metal truss webs not meeting min. distance requirements from these types of obstructions per NFPA 13 8.6.5.2.1.7.
|