INSP-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 | A | PASS |
Forrest France
|
|
|
The required corrections have been completed, final inspection passed, permit finaled.
|
INSP-Final Inspection | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | NR |
Forrest France
|
|
|
derrick - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Hydro test failed, some items not complete for final.
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | FAIL |
Forrest France
|
|
|
AG hydro failed due to visible leakage at the riser manifold.
|
INSP-Supply line flush | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush performed satisfactory.
|
INSP-Supply line flush | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | PART |
Forrest France
|
|
|
UG hydrostatic test of the supply line passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2006 | 4/13/2006 | 4/13/2006 | A | PART |
Forrest France
|
|
|
Overhead rough-in corrections have been made, 3rd floor is acceptable for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/12/2006 | 4/13/2006 | P | DEFR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 4/12/2006 at 8:51:23 AM. Contact: ###-####. Inspection to be completed 4/13.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Forrest France
|
|
|
The 1st and 2nd floors only are good for rough-in cover, the third floor needs a tenting inspection for cold cavity protection prior to approval for cover, also two heads at the living room and hall (3rd floor) do not meet min. spacing requirements for these heads.
|