INSP-Final Inspection | 1/27/2006 | 1/27/2006 | 1/27/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work is satisfactory, c/n items have been completed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2006 | 1/27/2006 | 1/27/2006 | A | PART |
Forrest France
|
|
|
Hydrostatic test of the antifreeze system passed inspection, leakage has been repaired.
|
INSP-Final Inspection | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | PART |
Forrest France
|
|
|
CORRECTIONS REQUIRED:
1. Alarm related devises need verified, tested and activated prior to ACCEPTANCE (this portion is connected to the new alarm system). This means FIR05-00712 needs finaled FIRST.
2. Anti-freeze riser needs flexible coupling at base and top of riser.
3. The anti-freeze riser needs tagged with an approved state Fire Marshal tag AND all antifreeze control valves, drains and auxiliary drains shall be provided with signage per NFPA 13-6.7.4*. Include hydraulic calculations sign for each design area per NFPA 13-16.5*. In addition, provide a tag indicating the type of solution, quantity, freeze point (indicate by what method tested), date installed and company.
4. Provide a lateral sway brace on the north end main of the Porte-Cohere (canopy).
5. Hydro test anti-freeze system.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2005 | 12/19/2005 | 12/19/2005 | P | CANC |
Forrest France
|
|
|
Wrong permit called in, the inspection under the correct related permit to be performed tomorrow as agreed.
|