Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR05-00768
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 5010 W OVERLAND RD
Project Namealm - PHASE II of upgrade agre
Customer Number 
ePlanReview 
Description
To provide eight (8) duct smoke detectors as per Phase II (East wing of the shopping center) of the upgrade agreement signed 3/3/2005. This phase is to be completed by 12/31/2005. The plans were to arrive by 9/1/2005 and were actually submitted 11/7/2005.

FIR05-00185 (finaled 9/6/2005) was to upgrade the existing fire alarm system (a single FACP) in the shopping center. (A copy of the upgrade agreement is on sheet F0.0.) A required manual fire alarm system is required in the northwest corner of the center (Mike's Restaurant, Primerica, Calvary Chapel, Stage Coach Theatre and Heart and Home) due to the A occupancy load. The remainder of the shopping center will consist of sprinkler monitoring, HVAC shutdown and cooking hood monitoring. Albertson's has its' own FACP and will be allowed to do so due to the fire barriers that separate fire areas.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20062/22/20062/22/2006PPASS
DetailsTroy Cobbley
Permit finaled. Contractor provided verification that the duct smoke detectors mounted in the 90 met the manufactures requirements.
INSP-Final Inspection2/16/20062/21/20062/21/2006PCANC
DetailsTroy Cobbley
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
INSP-Final Inspection1/18/20061/26/20061/26/2006AFAIL
DetailsTroy Cobbley
Provide holes around the duct detector housings, provide differential test for the roof mounted duct detectors since they are mounted in 90's, test unit that was not working in the flower shop