Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00801
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 1055 N CURTIS RD
Project Namealm St Al's Central Tower Add
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide the FCC (for the Central Tower, per IFC 509; obviously not all items will be completed in this permit, but will be required under another FA permit) to be located in the North tower. The generators for the Central Tower are to be installed and functional to supply emergency power to the Family Maternity Center (FMC). The basement areas required in the Central tower will be Comm (07201), Electrical rms (07202 & 07203) and the generator room, all located in the northwest portion of the basement in the Central Tower. As this will be a high-rise, voice-evac and fire department communication systems are required. At this point, the required manual fire alarm system includes fire pump monitoring, fire water tank monitoring, total area smoke detectors and notification throughout the above listed spaces.

The associated fire sprinkler permit (FIR 05-00536) is to 8" U.G. fire service supply, Fire Booster Pump, Secondary Water Tank System, Standpipes, Basement, through the 10th floors w/floor zone controls. The North Tower Remodels of the Basement, 1st, 2nd & 3rd, 4th Floor & South Tower Remodels 1st & 2nd Floors.

The associated building permit (BLD 05-00633) is to complete the interior build out & finish for portions of the entire 357,555 sq. ft., 10 story central tower, 9 stories for medical and support uses' and 1 story for mechanical penthouse and a 41,610 sq. ft. basement. First floor pharmacy and 2nd floor access corridor are being completed and occupied under separate permits (BLD05-00635 & BLD05-00634). Work includes protection of building elements per Table 601 for "IA" construction of 2003 IBC; framing to be non-combustible, with finishes per approved plans; electrical, plumbing, mechanical, fire suppression, alarm, medical gas and exit systems to meet tenant needs and provide compliance with minimum current adopted codes and ordinances. work also includes selective interior demolition and remodel of portions of the existing North and South Towers as they are connected to the new Central Tower. (drs) (ST ALPHONSUS CENTRAL TOWER)(INTERIOR FIT UP)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/6/20086/9/20086/10/2008APASS
DetailsTroy Cobbley
permit finaled
INSP-Alarm Testing9/13/20069/13/20069/15/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given for the basement mech. room. A/v's have been tested, smoke detectors and the sprinkler control valves for this same areas sprinkler system. The fire pump and related items are not ready yet.
FIR-Aging Inspection6/21/20066/21/20066/23/2006 NR
DetailsTroy Cobbley
Central tower work is in progress