Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00819
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 601 W GOWEN RD
Project NameSPR WESTERN POWER SPORTS ADD
Customer Number 
ePlanReview 
Description
WESTERN POWER SPORTS - WAREHOUSE ADDITION * To add two, 6" wet overhead fire sprinkler systems, protecting Palletized or Solid Piled Storage of Class I through IV Commodities to 20'-0", incorporating EFSR heads, within a new 48,600 sq. ft. one story Type IIB warehouse addition located on the west side of the existing building. The water supply will be connected to an existing Aurora 6-481-188, 105 psi/1500 gpm rated booster pump, and a (current) United Water supply of 55 static, 3,500 gpm flow @ 20 psi, located in existing riser room which was installed under shell permit FIR01-00031, modified later under FIR02-00477 for adding racks within a 106,964 ft/2 type II-N building permitted for B, S1, A3 occupancies. (The original design was with a water supply quoted at 62 static, 1,500 @ 20 psi). The building is fully fire sprinklered with an unlimited area designation. Any racking over 8'-0" will require separate plans and permits prior to installation. Also separate plans and permits required for the above ground water tank used for fire flow. All fire sprinkler overhead and related work shall comply with the IFC 2003, the attached review comments/conditions; all regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-02148.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/15/20066/16/20066/16/2006APASS
DetailsForrest France
Required corrections have been made and verified for completion, final inspection for the permitted work passed.
INSP-Sprinkler Rough-in/Hydro5/12/20065/15/20065/15/2006APART
DetailsForrest France
Overhead hydrostatic test performed satisfactory. Need to provide correct spacing of pendent heads in the expanded office area, ESFR heads are blocked by ductwork at two locations, provide both high and intermediate temp heads in the head box.