HIGHLAND HOMES LLC * To install a (modified) life safety NFPA 13D system in a five bedroom, four bathroom 4,116-f/2 two story single family dwelling (2,466-ft/2 first floor/1650-ft/2 second floor) with a attached 882-ft/2 three car garage. The modification is the installation of a single row of dry sidewall sprinklers along the common wall attached to the garage and the living space. System shall be equipped with an alarm initiating device and an outside alarm. All fire sprinkler work and related, which includes dual use, single service water supply, the system backflow prevention device (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD04-02054.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/17/20064/18/20064/18/2006APASS
DetailsTroy Cobbley
Fire sprinkler permit finaled
INSP-Final Inspection4/13/20064/14/20064/14/2006AFAIL
DetailsTroy Cobbley
No city approved plans on site for inspection. The pendant head in the kitchen still exceeds 10' from the exterior wall. Pendant head in the upper bedroom exceeds 10' from wall. Light and ceiling fans are obstructing pendants in upper and lower bedrooms. Pendant head in den is blocked by arched entry into small connecting foyer (must be atleast 6' away). Need to pipe drain to exterior and provide correct orfice for testing. Underground has not been flushed yet. There may be other items that are addressed on the approved plans but was unable to verify due to missing plans.
INSP-Final Inspection4/12/20064/13/20064/14/2006PCANC
DetailsTroy Cobbley
Would it be possible to have this inspection around noon. James is the contact @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice
INSP-Sprinkler Rough-in1/10/20061/11/20061/11/2006APART
DetailsForrest France
Overhead rough-in is acceptable to cover pending corrections as noted on plans including overspaced head at kitchen, overspaced head at 2nd floor hall, install head at master bathroom as indicated, the backflow device installed is not as submitted (provide correct device or verify calcs are the same), tenting at cold cavity areas is satisfactory.
INSP-Sprinkler Rough-in12/21/200512/22/200512/22/2005AFAIL
DetailsTroy Cobbley
Provide letter for installation prior to approved plans to bill, resubmit plans with piping changes. No inspection performed.