INSP-Final Inspection | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PASS |
Forrest France
|
|
|
C/N items have been verified for completion, OH piping flushed per contractor, permit finaled.
|
INSP-Final Inspection | 7/18/2006 | 7/19/2006 | 7/19/2006 | A | PART |
Forrest France
|
|
|
Need to provide test certification for the backflow preventer prior to final, need to secure main control valves as required. Also NOTE: The overhead system piping was connected and filled using the UG supply prior to field inspection of the UG line flush as required, sprinkler contractor is aware of code violation. Line flush performed post OH system fill. Remaining final inspection items are satisfactory.
|
INSP-Supply line flush | 7/14/2006 | 7/18/2006 | 7/19/2006 | A | NH |
Forrest France
|
|
|
Please call Brian Johansen (Johanson Plumbing) Prior to arrival. This is a public utility line servicible only by utility contractor.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Called contact number and left a message, no return phone call was made to coordinate inspection time, no inspection performed.
|
INSP-Final Inspection | 7/12/2006 | 7/13/2006 | 7/13/2006 | A | CANC |
Troy Cobbley
|
|
|
James said he is not ready.
|
INSP-Final Inspection | 6/27/2006 | 6/28/2006 | 6/27/2006 | A | CANC |
Forrest France
|
|
|
Could we get this inspection around 9:30 am. James is the contact @###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Forrest France
|
|
|
Lacking proper coverage at one "closet " area on the first floor, tenting has been adjusted at one bedroom location, the remainder of overhead rough-in is good for cover, possible light fixture obstructions at certain locations depending on the fixture dimentions.
|