Permit Information
Permit NumberFIR05-00883
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2970 W ELDER ST
Project NameSPR UG CAMBRIA SUITES
Customer Number 
ePlanReview 
Description
(CAMBRIA SUITES) - To install approximately 37'-0" of 8" C-900 PVC with two MJ 90's connected on the north side property lined running south and offsetting into an "Mechanical Room" (w/outside access) located on the north west side of the proposed 78,220-ft/2, four story, wood framed, 119 unit motel with meeting rooms, indoor swimming pool, indoor spa, lobby area and commercial food kitchen and Porte Cochere. This building is fully fire sprinklered for area increase. The underground riser is designated as 6" Ductile Iron with an M.J. Adapter. Riser thrust blocking is by retaining glands. Underground thrust blocking is by concrete. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-02392.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/4/20074/4/20074/4/2007PPASS
DetailsForrest France
UG supply line permit finaled.
INSP-Sprinkler Rough-in/Hydro3/16/20073/16/20073/16/2007PPART
DetailsForrest France
UG fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro8/14/20068/15/20068/16/2006PCANC
DetailsForrest France
Wrong permit number requested for inspection.
INSP-Sprinkler Rough-in/Hydro7/13/20067/14/20067/14/2006AFAIL
DetailsTroy Cobbley
Arrived at job site to witness the underground hydro test but they were not ready.
INSP-Supply line flush6/29/20066/30/20066/30/2006APART
DetailsForrest France
UG supply line flush performed satisfactory.
INSP-Sprinkler Rough-in1/24/20061/25/20061/25/2006APART
DetailsForrest France
Approved plans were not available for review at the time of inspection (locked in job trailer), the installation of an 8" supply, ductile riser, and thrust block verified. Depth of bury and bedding is okay, need to provide seismic clearance method for the ductile riser at floor slab and protect the open riser pipe end from debris.