INSP-Final Inspection | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | PASS |
Forrest France
|
|
|
Required corrections have been made, fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PART |
Forrest France
|
|
|
Verified forward flow, PIV tamper has been disconnected from outside water flow bell as discussed, final pending plan resubmittals as required.
|
INSP-Sprinkler Rough-in/Hydro | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | FAIL |
Forrest France
|
|
|
Heads are overspaced at location adjacent to office wall and sales floor (exceeding 130ft/2), related demo permit FIR06-00010 must be called in for final, per plan review notes a plan re-submittal is required-see items #1thru 5, perform forward flow test for the backflow preventer (note: system riser modification may be required), system alarm and supervision must be tested and approved prior to final for this sprinkler permit.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test is satisfactory, rough-in inspection not completed due to failure of the contractor to provide approved plans, review comments, and inspection card on site as required under condition of the permit.
|