COMET CLEANERS * To install the underground supply and overhead Ordinary Group 1 wet pipe fire sprinkler system for a 3,100-ft/2 tenant in a V-B strip mall referenced as Pennsylvania Station. Fire sprinkler work shall be per plans (which may include red-lined notes), attached plan review conditions/comments, IFC 2003, NFPA 13-2002 and 72, as regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to any other permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/21/20064/24/20064/24/2006APASS
DetailsForrest France
Fire sprinkler work passed final inspection.
INSP-Sprinkler Rough-in/Hydro4/20/20064/21/20064/21/2006PPART
DetailsForrest France
Hydrostatic test for the UG supply and the overhead system both passed inspection. Rough-in inspection is satisfactory as well, need to provide a ball drip at the FDC, and signage at the FDC per review notes.
INSP-Supply line flush4/12/20064/13/20064/13/2006APART
DetailsForrest France
UG supply line flush performed satisfactory, the PIV has been adjusted to the required height above finish grade.
INSP-Supply line flush4/7/20064/11/20064/11/2006PDEFR
DetailsForrest France
No time available to complete this inspection today, to be rescheduled per conversation with contractor.
INSP-Sprinkler Rough-in3/27/20063/28/20063/28/2006AFAIL
DetailsForrest France
The yard post indicator is below min. height requirements above finish grade, need to cap ductile riser piece, provide seismic clearance at floor slab. Thrust blocks are acceptable, the majority of UG pipe run was covered prior to inspection.