Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR06-00064
StatusFinaled
Name M2 AUTOMATION
Site Address 2601 N BOGUS BASIN RD
Project Namealm - HEALTHWISE
Customer Number 
ePlanReview 
Description
To extend the required manual fire alarm system into the new addition of the building and includes sprinkler monitoring, HVAC shutdown, fire/smoke damper control, door release and notification throughout. Manual pull stations are included at each exit. The existing required manual fire alarm system includes sprinkler monitoring, HVAC shutdown, fire/smoke damper control, door release, elevator recall/shutdown and notification throughout.

The associated building permit BLD05-02015 is to construct a new 16,754 sq. ft. three story type II-A office addition to an existing three story office building. Other work includes all site improvements, paving, landscaping, demolition, trash enclosure and motorcycle cover per approved plans and attachments, DRH05-00066, CUP05-00014/CFH05-00008. This building is fully fire sprinklered with sprinklers used for 1 hour substitution. Healthwise Building Addition -

The associated sprinkler permit FIR05-00901 is to install a combination Light Hazard wet system and a Class 1 Manual Standpipe system (in the North Stair Well) for a new 16,754-ft/2, three story, Type II-A office building addition. This building is fully fire sprinklered for 1 hour substitution. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this permit, to provide witness for compliance verification of minimum code. This permit is attached to building permit: BLD05-02015. HEALTHWISE BUILDING ADDITION

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/13/200610/13/200610/13/2006PPASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Alarm Testing10/11/200610/12/200610/12/2006APASS
DetailsForrest France
Corrections have been verified for completion, inspection passed.
INSP-Alarm Testing10/10/200610/11/200610/11/2006PCANC
DetailsTroy Cobbley
No time for inspection due to time constraints and micron plan review
INSP-Alarm Testing10/9/200610/10/200610/10/2006PFAIL
DetailsTroy Cobbley
See as-built drawings for corrections needed on the first and second floors. The monitoring agency did not receive any alarm signals. All items will need to be retested. Third floor items have been corrected.
INSP-Alarm Testing10/6/200610/9/200610/9/2006APART
DetailsForrest France
Items tested today include complete sprinkler monitoring and notification and detection devices for the third floor only. Noted the first floor zone tamper and the standpipe control tamper are addressed as the same point, two duct detectors on the 3rd floor as noted on approved plans are poorly located and will require changed configuration or a magnehelic test, damper for ID 173 as marked on plans operates backwards, covers on some strobes were removed while on site. As builts for field mods have been provided. Inspection concluded after two hours on site due to time constraints, still need to test 1st and 2nd floors, verify signals, verifiy corrections for the 3rd floor as noted today.
INSP-Alarm Testing10/4/200610/6/200610/6/2006PCANC
DetailsTroy Cobbley
No time left in day for inspection
INSP-Alarm Testing10/4/200610/5/200610/4/2006PCANC
DetailsTroy Cobbley
Forrest or Troy, Will 4:00PM work on Thursday? Please Let me Know. Thanks Mike; Phone #: ###-#### Internet Inspection Request from: Mike Timmerman Inspection cancelled from web by: Mike Timmerman