INSP-Final Inspection | 4/2/2007 | 4/2/2007 | 4/3/2007 | P | PASS |
Forrest France
|
|
|
Required corrections have been verified for compliance, final fire sprinkler inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | CANC |
Forrest France
|
|
|
johnathan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
INSP-Final Inspection | 3/29/2007 | 3/30/2007 | 3/30/2007 | P | FAIL |
Forrest France
|
|
|
The remainder of building final sprinkler inspection walkthrough completed today, noted heads are overspaced in the linen storage rooms on 2nd and 3rd floors, heads in the electrical room on the 4th floor are overspaced, missing heads at two mechanical closets on the 4th and 3rd floors, need to remove tape covering one head in the pool room, missing ceiling tile at the 1st floor storage rooms.
|
INSP-Final Inspection | 3/27/2007 | 3/28/2007 | 3/28/2007 | A | FAIL |
Forrest France
|
|
|
Missing heads in the building storage room, blocked pendent at the first floor east stair landing, missing escutcheons at several locations, painted head in the pool room, missing flex coulpings at the riser, wet head in the cooler at 33 deg. maintained, one head is overspaced at the ADA room, inspection concluded at the first floor due to the number of defficient items found.
|
INSP-Final Inspection | 3/21/2007 | 3/23/2007 | 3/23/2007 | A | FAIL |
Forrest France
|
|
|
Project is not ready for final as several defficiencies were noted on the first floor including overspaced heads, blocked and obstructed heads, missing escutcheons, painted heads, wet head in a cooler maintainig a temp of 35 deg, missing heads, missing ceilings, missing "911 sign", etc. Need sprinkler alarm supervision test and forward flow prior to final. Remainder of the full building sprinkler final walkthrough and test postponed until necessary corrections are made and contractor is ready for final.
|
INSP-Sprinkler Rough-in/Hydro | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | PART |
Forrest France
|
|
|
Retest of the 1st floor hydrostatic OH passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | FAIL |
Forrest France
|
|
|
OH hydrostatic test failed for the 3" manifold system due to pressure loss at the guage, the 4" manifold system hydro passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | FAIL |
Forrest France
|
|
|
Correction notice items from the previous inspection for the antifreeze system completed on 2/27/07 are not complete, also noted to contractor some items still in need of completion including OH floors 1-4 and UG supply hydro tests, missing heads in the gravity chute, and remaining OH inspections.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | FAIL |
Forrest France
|
|
|
Inspection for the antifreeze system hydrostatic test failed due to visual leakage at two locations, also the SW heads as installed under the exposed composite wood joist obstructed construction ceiling do not meet requirements of NFPA 13 8.4.2 (1).
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2007 | 2/26/2007 | 2/26/2007 | P | CANC |
Forrest France
|
|
|
Cancel inspection per phone call from contractor.
|
INSP-Sprinkler Rough-in | 8/18/2006 | 8/21/2006 | 8/21/2006 | P | PART |
Forrest France
|
|
|
c/n items related to the 1st floor rough-in have been completed, 2nd floor guest rooms are okay to cover.
|
INSP-Sprinkler Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 | P | FAIL |
Forrest France
|
|
|
Inspection for 1st floor rough-in failed due to overspaced hanger at east entry, blocked upright heads above the pool area in the concealed combustible space, missing hangers at some locations, head in the linen room is overspaced, branch line at the electrical room extends through both sides, one area at the SE as indicated on plans is not completed for inspection at this time.
|
INSP-Sprinkler Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 | A | PART |
Forrest France
|
|
|
OH rough-in inspection at floors 3 and 4 only are okay for cover as discussed, one head is overspaced at guest room east side 4th floor, end of line heads at some locations exceed upward lift allowed and will require restraint, noted hanger overspacing at certain locations on 1" branch lines, heads at some locations will require adjustment to meet ceiling height, noted thermal expansion at grid system on the 3rd floor.
|
INSP-Sprinkler Rough-in | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | NR |
Forrest France
|
|
|
Per contractor the inspection request was intended for Tues. 7/11, no approved plans on site for review, to be rescheduled.
|