Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00144
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 405 S CAPITOL BLVD
Project NameBODO BLDG #8 - SPR
Customer Number 
ePlanReview 
Description
KBS BURRITOS - BODO BLDG #8 - 1ST STORY * This building is fire sprinklered because it is a high-rise. To add 15 Q.R., SSP's (1 dry pendant), replace and relocate 16 SSP's with Q.R. heads for the creation of an 1,981-ft/2 restaurant tenant space (746-ft/2 dining, 680-ft/2 kitchen; 184-ft/2 office, 371-ft/2 restrooms, hallways, and vestibule), located on the first story of an 11 story high rise building. Fire sprinkler work is related to the installation of interior nonbearing walls, a Type 1 (grease) Hood and duct w/2-hr shaft and suspended gypsum board ceilings. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-03270.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/25/20065/26/20065/26/2006APASS
DetailsForrest France
Contact: Todd; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
Sprinkler Inspection card is missing.
DOC - Permit Finaled  5/26/2006 DONE
INSP-Sprinkler Rough-in4/27/20064/27/20064/27/2006PPART
DetailsForrest France
The fireproofing at the hangers has been repaired, overhead sprinkler is acceptable for cover at the hard lid areas.
INSP-Sprinkler Rough-in/Hydro4/25/20064/26/20064/26/2006AFAIL
DetailsTroy Cobbley
Need to repair the fire proofing that has been removed for the installation of pipe hangers.