INSP-Final Inspection | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler permit finaled
|
INSP-Final Inspection | 7/12/2006 | 7/13/2006 | 7/13/2006 | A | FAIL |
Troy Cobbley
|
|
|
Corrections as noted on the previous inspection have been taken care of but the contractor did not have the approved plans on site so that the inspection could be continued.
|
INSP-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 | P | FAIL |
Forrest France
|
|
|
Noted several issues including overspaced head, blocked coverage by ductwork in several locations, incorrect temp ratings at the kitchen hood area, missing ssp in the mech. closet, one head with bent deflector needs to be replaced, min. spacing between heads is exceeded at one location. Inspection concluded at the first floor due to number of defficiencies, no inspection done for the basement area at this time.
|
INSP-Final Inspection | 7/6/2006 | 7/7/2006 | 7/6/2006 | A | CANC |
Forrest France
|
|
|
Final Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|