INSP-Final Inspection | 4/18/2007 | 4/19/2007 | 4/19/2007 | P | PASS |
Forrest France
|
|
|
Corrections verified for completion, final fire alarm inspection passed, permit finaled.
|
INSP-Final Inspection | 4/13/2007 | 4/16/2007 | 4/16/2007 | P | FAIL |
Forrest France
|
|
|
Strobe notification devices at intermittent areas failed to function properly during alarm testing.
|
INSP-Final Inspection | 7/11/2006 | 7/12/2006 | 7/12/2006 | A | PART |
Troy Cobbley
|
|
|
This inspection was for the MI Waiting room and the Reception area only. Fire alarm passed in this area. The double doors that enter the reception area did not latch completely upon release of the door holders and will need to be reverified at final.
|
INSP-Final Inspection | 5/17/2006 | 5/18/2006 | 5/18/2006 | P | PART |
Forrest France
|
|
|
Fire alarm testing for the area of remodel designated as phase one is acceptable as marked on approved plans, one duct detector has the sample and vent tubes installed backward, need to test the manual pull at the nurses station, will verify these items at next inspection for the remainder of the project scope.
|