Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR06-00218
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 1889 N WILDWOOD AVE
Project NameSPR TED MASON SIG HOMES
Customer Number 
ePlanReview 
Description
(TED MASON SIGNATURE HOMES - CONDO UNITS 22 & 23 BUILDING #3) This building is fire sprinklered for story increase and for fire flow. To modify a shell system by adding and relocating fire sprinklers for a new 5,139-ft/2, 2 story office tenant space (2,675 square foot 1st floor and 2,464-ft/2 2nd floor) within an existing 5,550-ft/2 foot print building. The shell was constructed as a one story building under permit BLD05-01262. Fire sprinkler work is related to the installation of steel columns, wood beams, wood floor joists, interior walls, shear walls, four restrooms and suspended ceilings. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The shell fire sprinklers were permitted under FIR06-00161. This permit is attached to BLD05-03298.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/13/20069/15/20069/15/2006APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro8/28/20068/29/20068/29/2006APASS
DetailsTroy Cobbley
The remaining piping on the first floor is ok to cover. Two additional upright sprinkler heads are required as discussed due to duct blockage. Their placement will be verified at the final.
INSP-Sprinkler Rough-in/Hydro8/24/20068/25/20068/25/2006PPART
DetailsTroy Cobbley
The second floor sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro7/24/20067/24/20067/24/2006PPASS
DetailsTroy Cobbley
Hydro test of the FDC passed.
INSP-Final Inspection7/20/20067/21/20067/21/2006AFAIL
DetailsTroy Cobbley
Still need to hydro test the FDC and connect/test the alarms. Forward flush passed. The rough-in for the south tenant failed due to numerous obstructions to the upright sprinkler heads by duct work.
INSP-Sprinkler Rough-in/Hydro7/20/20067/21/20067/21/2006APASS
DetailsTroy Cobbley
Above ground hydro test passed. Still need to hydro the remote FDC.
INSP-Supply line flush6/28/20066/29/20066/29/2006PPASS
DetailsTroy Cobbley
underground supply line flushed passed
INSP-Sprinkler Rough-in/Hydro6/14/20066/15/20066/15/2006PPASS
DetailsTroy Cobbley
Piping understairs, above restroom and entry lobby ok to cover.
INSP-Sprinkler Rough-in/Hydro6/14/20066/16/20066/14/2006PCANC
DetailsTroy Cobbley
Contact is Jeff Chaney; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro6/12/20066/12/20066/13/2006PPASS
DetailsTroy Cobbley
200lb Hydro Test Passed
INSP-Sprinkler Rough-in/Hydro4/27/20064/27/20064/27/2006PPASS
DetailsTroy Cobbley
The remaining portion of the underground is ok to cover