INSP-Final Inspection | 12/13/2010 | 12/16/2010 | 12/16/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 11/17/2010 | 11/23/2010 | 11/24/2010 | A | DONE |
Troy Cobbley
|
|
|
I followed up with Steve Bevans ###-####and he stated that he had just met with Dave Whiting, ADT, and that the project is moving forward. A follow up inspection is set up for next week.
|
FIR-Aging Inspection | 11/10/2010 | 11/10/2010 | 11/17/2010 | | NR |
Troy Cobbley
|
|
|
I spoke to Steve Bevans, chief operating officer, at this project site and went over needing to get the final inspection done. He will meet with others and contact me shortly. A follow up inspection has been scheduled for next week.
|
INSP-Conference | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over the outstanding issues as per the permit history with Keith at ADT.
|
INSP-Final Inspection | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | FAIL |
Troy Cobbley
|
|
|
No test was performed since the sensors are not installed.
|
FIR-Aging Inspection | 8/7/2006 | 8/7/2006 | 8/8/2006 | | NR |
Troy Cobbley
|
|
|
Keith was following up on project
|
INSP-Conference | 11/24/2010 | 12/1/2010 | | A | |
Troy Cobbley
|
|
|
Follow up inspection. Steve Bevans ###-####
|