INSP-Final Inspection | 10/26/2006 | 10/27/2006 | 10/27/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/25/2006 | 10/26/2006 | 10/26/2006 | P | PART |
Forrest France
|
|
|
Supply line flush completed satisfactory, contractor not ready for final at this time as the riser is not completed and missing some items such as calc. stickers, signs, locks for control valves, head box, etc., still need to perform alarm test.
|
INSP-Sprinkler Rough-in | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Troy Cobbley
|
|
|
Corrections as noted on the approved plans have been corrected. Sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | FAIL |
Forrest France
|
|
|
One head in the basement as circled on approved plans requires vertical restraint, the 5' section of 11/4 pipe as circled on plans exceeds allowable deflection distances, need to provide cold cavity protection above the dining area, one head has been added in the second floor bathroom, some areas as piped do not match routing as shown on stamped plans.
|