Permit NumberFIR06-00282
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 1109 W MYRTLE ST Unit: 300
Project NameSPR NYL PIONEER PLZA 300
Customer Number 
ePlanReview 
Description
NEW YORK LIFE - PIONEER PLAZA - STE 300 * This building is fully fire sprinklered for one-hour substitution. To replace all existing Standard Response (114 SSP's & 1 SSU) with Quick Response sprinklers. To relocate 29 positions and add 31 new positions within the remodel a 9,558-ft/2 office tenant which will occupy the entire third floor of an existing building. Fire sprinkler work is related to the (possible) downgrading of construction and extending exit travel distances, new interior walls and some small areas of suspended ceiling work. Some sprinkler demolition work was accomplished under FIR06-00225 by another contractor. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-00401.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/19/20065/22/20065/22/2006PPASS
DetailsForrest France
Fire sprinkler passed inspection, permit finaled.
INSP-Sprinkler Rough-in/Hydro5/16/20065/17/20065/17/2006APART
DetailsForrest France
Inspection was for overhead rough-in cover. The installation matches plans which are currently being resubmitted per contractor. Rough-in as installed is okay pending city plan review approval. Three areas as marked on plans need corrected including overspacing at a corridor intersection, head too close to a wall in SW room, the elevator shaft head needs to be QR.