INSP-Final Inspection | 8/8/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, permit finaled.
|
INSP-Final Inspection | 8/3/2006 | 8/7/2006 | 8/4/2006 | A | CANC |
Forrest France
|
|
|
Contact: Todd - Final; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2006 | 8/4/2006 | 8/4/2006 | A | PART |
Forrest France
|
|
|
Hydrostatic test of the OH sprinkler system and UG supply line passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2006 | 8/3/2006 | 8/3/2006 | P | DEFR |
Forrest France
|
|
|
Contact: Todd - Need UG & OH Hydro Test; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection rescheduled
|
INSP-Supply line flush | 7/28/2006 | 7/31/2006 | 7/31/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2006 | 7/31/2006 | 7/31/2006 | A | PART |
Forrest France
|
|
|
Noted required corrections from previous inspection have been completed, approved plans do not show a hose supply line which has been added to two 11/2 hose valves at center columns- approved plans to reflect these modifications.
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2006 | 7/28/2006 | 7/28/2006 | A | NR |
Forrest France
|
|
|
Items on previous correction notice are not yet completed for reinspection per phone conversation with contractor.
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2006 | 7/27/2006 | 7/28/2006 | P | FAIL |
Forrest France
|
|
|
Approved plans and review notes were not on site for inspection, noted some general items to the contractor which will need correction at the riser.
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | DEFR |
Forrest France
|
|
|
Duplicate inspection request.
|
INSP-Sprinkler Rough-in/Hydro | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | DEFR |
Forrest France
|
|
|
Contact person not available, inspection rescheduled for 7/27.
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2006 | 6/19/2006 | 6/20/2006 | P | PART |
Forrest France
|
|
|
UG supply line is acceptable for cover.
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2006 | 6/16/2006 | 6/19/2006 | P | DEFR |
Forrest France
|
|
|
To be rescheduled due to time constraints.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2006 | 6/16/2006 | 6/15/2006 | A | CANC |
Forrest France
|
|
|
Contact Dave UG Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|