Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00336
StatusFinaled
Name ALARM SYSTEMS INTEGRATION INC
Site Address 276 N 8TH ST
Project NameIDAHO BUILDING
Customer Number 
ePlanReview 
Description
To provide two (2) UL listed junction boxes on the ceiling in the basement to provide access to fire alarm wiring that required to be spliced. The fire rating of the ceiling (hard lid) must be maintained. The PDS Fire shall field verify UL listing, fire rating and functionality of the FA system for Z-1 (basement waterflow), Z-2 (basement tampers), Z-3 (1st floor waterflow), Audible CKT1 and the interconnection between FACP (1st floor) and the dialer in basement.

The associated building permit (BLD06-00522) is to remodel a 940 sq.ft. area in the basement for a 608 sq ft office space and a 332 sq ft computer server room. Work to include construction of noncombustible partitions, relocation of a door, installation of ceiling and lighting, miscellaneous related finishes. This building is fully fire sprinklerd ANY alterations to the sprinkler system shall be installed per NFPA #13 as regulated by the fire department. Rmh (Beck construction RCE-3198)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/11/20106/11/20106/11/2010PPASS
DetailsForrest France
Tested in conjunction with FIR06-00527.
FIR-Aging Inspection6/11/20106/11/20106/11/2010 DONE
DetailsForrest France
FIR-Aging Inspection1/24/20071/24/20071/30/2007 DEFR
DetailsForrest France