INSP-Final Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | CANC |
Troy Cobbley
|
|
|
please call russ to confirm time Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2007 | 6/8/2007 | 6/8/2007 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed.
|
INSP-Sprinkler Rough-in/Hydro | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations where sprinklers need to be added and insulation reattached to the roof deck. The sidewall sprinklers at the main entrance are too far from the deck. As-builts need to resubmitted showing the added line in the dining/remote area.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|
FIR-Aging Inspection | 10/12/2006 | 10/12/2006 | 10/12/2006 | | NR |
Troy Cobbley
|
|
|
work is in progress per Jeff
|