INSP-Final Inspection | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Final Inspection | 11/2/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Forrest France
|
|
|
Two of three items on the previous correction notice have been verified for completion including signage at the door to the FACP room and retest of the PIV tamper switch. The latching supervisory signals at the panel have been conditionally accetped for this project only by Boise City PDS department head B. Chatterton. Contractor failed to produce NFPA 72 record of completion forms at final testing, permit final pending correct documentation for acceptance signature.
|
INSP-Alarm Testing | 10/31/2006 | 10/31/2006 | 11/1/2006 | P | NR |
Forrest France
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
INSP-Alarm Testing | 10/24/2006 | 10/25/2006 | 10/25/2006 | P | FAIL |
Forrest France
|
|
|
The PIV tamper switch is not adjusted accurately, supervisory tamper switches shall be non-latching per requirements, need to provide a sign at the door to the room containing the FACP per review note #16.
|