INSP-Final Inspection | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PASS |
Forrest France
|
|
|
Final shell fire alarm inspeciton passed, permit finaled.
|
INSP-Final Inspection | 11/3/2006 | 11/6/2006 | 11/7/2006 | A | FAIL |
Forrest France
|
|
|
Initial inspection failed due to latching supervisory signals at the panel.
|
INSP-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | CANC |
Forrest France
|
|
|
No time available to complete this inspection.
|
INSP-Final Inspection | 11/2/2006 | 11/6/2006 | 11/2/2006 | A | CANC |
Troy Cobbley
|
|
|
Call us when you have a time. Thanks; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
INSP-Final Inspection | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | NR |
Forrest France
|
|
|
Per contractor the elevator shaft smoke and heat detectors are not yet installed.
|