Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00508
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 939 W BOEING ST
Project NameSPR OROWHEAT BAKERY
Customer Number 
ePlanReview 
Description
OROWHEAT BAKERY * To relocate 4 existing and add 3 new SSP's in the first floor offices and add 4 new L.O. SSU's in the existing warehouse for a new bakery tenant, which includes cooking, freezing and packaging of food products, in the existing 46,147-ft/2 warehouse/office building. The entire first floor and a portion of the 2nd floor to be occupied totaling 39,731-ft/2. The balance of 6,417-ft/2 of 2nd floor to be sealed off and not used. No information provided for the detached building on east side of property and this permit does not address occupancy of that structure. Fire sprinkler work is related to the removal of interior nonbearing partitions, the installation of new kitchen equipment. (The installation of new overhead door into existing concrete wall has no sprinkler work related, per submittal). This building is Fully Fire sprinklered for unlimited area building. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD06-01044.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/21/200612/21/200612/21/2006PPASS
DetailsForrest France
Plan modification work passed, previous c/n items are complete, inspection passed.
INSP-Final Inspection11/1/200611/3/200611/3/2006ANR
DetailsForrest France
Pending fire alarm completion.
INSP-Final Inspection8/14/20068/15/20068/15/2006AFAIL
DetailsForrest France
Need to provide missing hangers at three new arm-overs in the warehouse area, noted the existing riser is not monitored and the dry system main control is shut, ceiling tile adjacent to sprinkler heads in the office area must be reinstalled prior to final.