Description
Beginning from an existing UG stub up into the bldg., install a new wet electric riser & wet pipe system to serve through out the existing 6,100 ft/2 heated bldg. The Underground supply was installed and accepted under permit # FIR04-00610. This permit is attached to BLD04-00084.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code.
Original Scope of Work:
Beginning from an existing UG stub up into the bldg., install a new wet electric riser & wet pipe system to serve through out the existing 10,000 ft/2 heated bldg. The Underground supply was installed and accepted under permit # FIR04-00610. This permit is attached to BLD04-00084.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code.
(03/22/07)
It appears that five upright heads were added in the remote area at the upper level. These heads need to be added to the calculations. Please resubmit plans and calculations to support this modification.
065/26/07 The heads were added to the calculations.
06/26/07 Rev #7 Revised Scope of Work:
Changes to the piping arrangement in the remote area were made during construction resulting in a resubmittal of plans and calculations.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/11/20077/12/20077/12/2007APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection7/10/20077/11/20077/11/2007PFAIL
DetailsTroy Cobbley
The fire dept connection is mounted too high and not all of the ceiling tile has been installed. The forward flush passed.
INSP-Sprinkler Rough-in/Hydro2/15/20072/15/20072/15/2007PPASS
DetailsTroy Cobbley
Overhead hydro test passed.
INSP-Sprinkler Rough-in/Hydro2/14/20072/14/20072/14/2007PPASS
DetailsTroy Cobbley
underground hydro test passed
INSP-Supply line flush2/8/20072/9/20072/9/2007PPASS
DetailsTroy Cobbley
Underground flush passed.