INSP-Final Inspection | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Forrest France
|
|
|
The remainder of correction notice items have been verified for compliance, final fire alarm inspection passed, permit finaled.
|
INSP-Alarm Testing | 4/3/2007 | 4/3/2007 | 4/3/2007 | P | PART |
Forrest France
|
|
|
See comments per field inspection completed by M. Timmerman.
|
INSP-Alarm Testing | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | FAIL |
Forrest France
|
|
|
See comments per inspection completed by M. Timmerman.
|
INSP-Alarm Testing | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | DEFR |
Forrest France
|
|
|
Field inspection performed by M. Timmerman.
|
INSP-Alarm Testing | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | FAIL |
Forrest France
|
|
|
FA inspection for the 4th floor only completed today, some defficiencies corrected while on site, other items in need of repair include non-functional SD 105 in the corridor, one SD at the SW corridor is overspaced, the fire damper at the north hall does not operate correctly, vending area lacks sufficient detector coverage, as-built plans do not show the deletion of two FD's.
|
INSP-Alarm Testing | 3/28/2007 | 3/28/2007 | 3/28/2007 | P | PART |
Forrest France
|
|
|
Sprinkler monitoring only tested today, noted addressing at the WF switches in the riser room to correctly identify the system served.
|
INSP-Alarm Testing | 3/26/2007 | 3/27/2007 | 3/27/2007 | A | NR |
Forrest France
|
|
|
Noted several items in need of correction including location and spacing of initiation and notification devices, cd ratings, manual pull station to be relocated, elevator monitoring, panel must be clear of all sprinkler supervisory signals prior to testing, missing signage at door to the FACP, etc.
|
INSP-Conference | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | DONE |
Forrest France
|
|
|
Regarding FA plans matching floorplan.
|
INSP-Conference | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | DEFR |
Forrest France
|
|
|
To be completed 2/23.
|