INSP-Final Inspection | 5/11/2007 | 5/14/2007 | 5/14/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/9/2007 | 5/11/2007 | 5/11/2007 | A | FAIL |
Troy Cobbley
|
|
|
The fire pump acceptance test passed. Fire sprinkler rough-in passed. Contractor supplied certification that the fire pump package had been hydro tested. The backflow was certified as I waited. To final the project the signage on the riser room door needs to be installed and the orfice to test the flow switch needs to be provided. The ventilation and drainage as is will be acceptable. Emergency lighting has been provided.
|
INSP-Sprinkler Rough-in | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Troy Cobbley
|
|
|
hydro test of the fdc passed.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Hydro test of the overhead piping is passed. Fire pump and fdc stills needs hydro testing
|
INSP-Supply line flush | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground flush and hydro test passed.
|
INSP-Supply line flush | 4/10/2007 | 4/11/2007 | 4/12/2007 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover. The underground vault has been deleted as well as the remote FDC. I notified the fire sprinkler contractor that approval is required for the relocation of the FDC.
|
INSP-Supply line flush | 4/10/2007 | 4/11/2007 | 4/11/2007 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 4/10/2007 at 8:22:07 AM. Contact: ###-####.
|
INSP-Supply line flush | 4/10/2007 | 4/12/2007 | 4/10/2007 | A | CANC |
Troy Cobbley
|
|
|
###-#### George Inspection cancelled from web by: Patricia Smith
|