Permit Information
Permit NumberFIR06-00540
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1111 W JEFFERSON ST
Project NameBoise Cascade Building
Customer Number 
ePlanReview 
Description
The data has been moved to a Word document attached to this case.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/19/20086/20/20086/20/2008APASS
DetailsForrest France
Verified items on correction notice for compliance, inspection passed, permit finaled.
INSP-Final Inspection6/16/20086/19/20086/19/2008ADEFR
DetailsForrest France
INSP-Final Inspection4/8/20084/10/20084/11/2008AFAIL
DetailsForrest France
See notes per inspection completed 4/11.
INSP-Final Inspection4/10/20084/11/20084/11/2008AFAIL
DetailsForrest France
See 12 item correction notice left on site for a list of defficient items including descriptors at several tamper and flow switches, missing head boxes and spare stock of sprinklers, noted missing coverage at four new stairwell pressure fan rooms at the mech. penthouse, need to demo class 2 fire hose cabinet valves no longer connected at the penthouse, roof and basement levels, missing sprinkler protection at the penthouse level cooling tower room enclosure, repair 2nd floor NE flow switch and NE basement tamper, supervisory signals shall report at the panel within 90 seconds per NFPA 72, provide signage at stairway standpipe isolation control valves, repair tamper and flow switches at the 5th floor NE riser, need signage at the doors to control valve rooms on the 5th floor NE and SW risers, noted seismic ugrades for the standpipe floor level penetrations have not been provided.
INSP-Final Inspection4/2/20084/7/20084/7/2008AFAIL
DetailsForrest France
Started testing flow and tamper switches, found that the programing to the fire alarm panel was not correct. Stopped inspsection.Will have to perform a complete retest on next inspection. KR
INSP-Final Inspection3/27/20083/28/20083/28/2008ANR
DetailsForrest France
Scheduled by a contractor via Hello! on 3/27/2008 at 3:25:39 PM. Contact: ###-####.
INSP-Final Inspection3/25/20083/27/20083/27/2008PNR
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro3/24/20083/25/20083/25/2008APART
DetailsForrest France
Accepted photographic documentation of seismic bracing at four locations including the plaza level NE, NW, SE, and SW corner 4-way braces inaccessible for viewing due to confined space and asbestos abatement. Images attached under "Documents"
INSP-Sprinkler Rough-in/Hydro3/18/20083/21/20083/21/2008APART
DetailsForrest France
Inspection completed satisfactory for the seismic upgrade work at the plaza level mains, also inspected the remainder of 2" feed piping for the plaza level bridge lines. Hydrostatic testing for this portion of work passed.
INSP-Sprinkler Rough-in/Hydro3/12/20083/14/20083/12/2008ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 3/12/2008 at 2:51:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 12 2008 5:20PM.
INSP-Sprinkler Rough-in/Hydro3/5/20083/6/20083/6/2008PPART
DetailsForrest France
Inspection for the seismic upgrade areas at the plaza level to be completed in conjunction with the hydrostatic test for this level per agreement.
INSP-Sprinkler Rough-in/Hydro2/25/20082/25/20082/25/2008APART
DetailsForrest France
Need to repair fireproofing at locations where removed for hanger attatchments, okay for ceiling cover when complete.
INSP-Sprinkler Rough-in2/19/20082/20/20082/20/2008APART
DetailsForrest France
OH installation for the plaza level branch lines and sprinklers as annotated on stamped plans is approved for cover, preliminary hydrostatic has been completed- will retest when the balance of the new main is finished.
INSP-Sprinkler Rough-in/Hydro1/14/20081/15/20081/15/2008APART
DetailsForrest France
Overhead rough-in is approved for cover at the drop ceiling areas as red lined and initialed on the stamped drawings, noted one head at a corridor to be replaced due to visible leakage at the seat.
INSP-Sprinkler Rough-in/Hydro1/14/20081/14/20081/14/2008ACANC
DetailsForrest France
daryl - ###-####
INSP-Sprinkler Rough-in/Hydro1/4/20081/7/20081/7/2008APART
DetailsForrest France
Noted on plans areas approved for cover at the drop ceilings 5th floor south and southeast. Also noted plans do not indicate sprinkler coverage to be provided at the 5th floor elevator lobby.
INSP-Sprinkler Rough-in/Hydro12/26/200712/27/200712/27/2007APART
DetailsForrest France
OH hydrostatic testing for the 3rd floor SW quad passed, OH rough-in inspection also completed and okayed for cover as noted, two minor items repaired while on site, one head as annotated on plans to be relocated due to shadowing at an adjacent wall-can be verified at next scheduled visit.
INSP-Sprinkler Rough-in/Hydro11/26/200711/27/200711/27/2007APART
DetailsForrest France
Hydro test passed. Ok to cover northwest side of the third floor. As per KR
INSP-Sprinkler Rough-in/Hydro11/14/200711/15/200711/15/2007APART
DetailsForrest France
Rough-in is okay as noted on approved plans for the 4th floor NW quad. OH hydrostatic testing for this area also passed, also inspected overhead install at the 3rd floor west and south skybridges.
INSP-Sprinkler Rough-in/Hydro10/26/200710/29/200710/29/2007APART
DetailsForrest France
Hydrostatic test for the 3rd floor NE quad passed, OH rough-in is also acceptable pending repair of beam fireproofing at noted locations where it has been removed to install branch line hangers, also noted field modifications to floorplan layout to be documented on as-built plans.
INSP-Sprinkler Rough-in/Hydro10/9/200710/10/200710/10/2007APART
DetailsForrest France
Ok to cover 3rd floor south east area,Hydro test passed.
INSP-Sprinkler Rough-in/Hydro8/21/20078/22/20078/22/2007APART
DetailsForrest France
OH hydrostatic test of the 4th floor west quad as marked on approved plan set passed, also inspected additonal corridor ceilings at the NW exit.
INSP-Sprinkler Rough-in/Hydro8/15/20078/16/20078/16/2007APART
DetailsForrest France
OH inspection for the 4th floor SW quadrant including the kitchen, cafeteria, eating areas, hallway and dining room as marked on approved plans are okay for ceiling cover. Hydrostatic testing for this area to be completed in conjunction with the next pahase of this floor. Also discussed scheduling for the basement seismic upgrades.
INSP-Sprinkler Rough-in/Hydro7/26/20077/27/20077/27/2007APART
DetailsForrest France
Inspection for the 1st floor SW quad OH fire sprinkler install is conditionally approved for cover except as noted on plans and pending satisfactory resubmittals matching the initialed field plan set.
INSP-Sprinkler Rough-in/Hydro7/24/20077/25/20077/25/2007APART
DetailsForrest France
OH hydrostatic test for the 5th floor SW quad passed.
INSP-Sprinkler Rough-in/Hydro7/19/20077/23/20077/23/2007AFAIL
DetailsForrest France
Inspection for the first floor SE quad failed due to significant floor plan changes in comparison to approved drawings.
INSP-Sprinkler Rough-in/Hydro7/18/20077/19/20077/19/2007APART
DetailsTroy Cobbley
The hydro test for the first floor southwest quadrant passed. The rough-in failed since the floor plan does not match the plans. I told both the fire sprinkler contractor and the general contractor I would not give permission to cover. The general contractor stated he was going to cover the piping no matter what and would deal with the reperconssions later.
INSP-Sprinkler Rough-in/Hydro6/29/20077/2/20077/2/2007APART
DetailsForrest France
OH hydrostatic test for the wet system 1st floor NW quad passed.
INSP-Sprinkler Rough-in/Hydro6/21/20076/22/20076/22/2007APART
DetailsForrest France
OH rough-in inspection for the 1st floor NW quad, noted three retaining straps not attatched to the beam, one pendent head in the men's restroom needs adjustment, heads at some locations are not yet cut into the ceiling tile. Also completed cursory walk through of a tenant improvement on the 5th floor-plans have not been approved or permit issued at this time for completion of this work.
INSP-Final Inspection5/30/20076/13/20076/13/2007APART
DetailsForrest France
Completed satisfactory field acceptance testing per NFPA 20 for the fire pump and controller. Test report attached. SLR
INSP-Sprinkler Rough-in/Hydro5/31/20076/1/20076/1/2007APART
DetailsForrest France
OH fire sprinkler install is okay for cover at the drop ceilings for a portion of the NW quad 1st floor remodel as red lined and initialed on plans.
INSP-Sprinkler Rough-in/Hydro5/9/20075/11/20075/11/2007APART
DetailsForrest France
OH rough-in for the 1st floor NE quad is acceptable for cover, also completed satisfactory hydrostatic testing for this area as well.
INSP-Sprinkler Rough-in4/25/20075/2/20075/2/2007PNR
DetailsForrest France
Fire Pump Test (Forrest) and for Info Sam
Per a conversation with Sam this morning we will do a pump run complete with test header flows,bypass flows,emergency power transfer. Phone #: ###-#### Internet Inspection Request from: Lynn Beus ............ Per conversation with the foreman on site, pump testing pending replacement of one component at the discharge side and scheduling with the pump mfr. rep to be present during testing.
INSP-Sprinkler Rough-in4/27/20074/30/20074/30/2007PCANC
DetailsForrest France
Inspection must be performed per NFPA 20 as required.
INSP-Sprinkler Rough-in/Hydro4/26/20074/27/20074/27/2007APART
DetailsForrest France
OH rough-in inspection for the 1st floor SE quad as marked on plans is approved for cover, hydrostatic testing for this portion of the system also completed satisfactory.
INSP-Sprinkler Rough-in/Hydro4/4/20074/5/20074/5/2007PPART
DetailsForrest France
OH fire sprinkler install at the 5th floor NE quadrant is acceptable for cover, noted one head in an OTS telephone room to be raised closer to the deck for proper heat collection, two arm overs at the restrooms to have hangers within 1' of the pendent head, seismic bracing 80% complete, the OH hydrostatic test is satisfactory.
INSP-Sprinkler Rough-in/Hydro3/15/20073/16/20073/16/2007APART
DetailsForrest France
OH hydrostatic test of the SE quadrant 5th floor (Office Max. TI) passed.
INSP-Sprinkler Rough-in/Hydro3/1/20073/2/20073/2/2007APART
DetailsForrest France
OH rough-in for the 5th floor SE TI area is okay for cover as noted, need to relocate two overspaced heads at the atrium glass, install head in the janitors closet, repair fireproofing at some hanger locations where removed.
INSP-Sprinkler Rough-in/Hydro2/28/20073/1/20073/1/2007PDEFR
DetailsForrest France
Rescheduled for 3/2
INSP-Sprinkler Rough-in/Hydro1/19/20071/22/20071/22/2007PPART
DetailsForrest France
Inspection for overhead rough-in at the 4th floor SW quad is acceptable pending the installation of missing retaining straps at several locations on branch lines and arm-overs in the SW corner of this quadrant, hydrostatic test for the south half of the 4th floor passed.
INSP-Sprinkler Rough-in/Hydro1/12/20071/16/20071/16/2007APART
DetailsForrest France
Inspection for the OH rough-in at the 4th floor SE quad portion as marked on approved plans is okay for cover, noted one head in a conference room to be relocated due to overspacing, one beam clamp in the men's restroom needs adjustment, walls for one room have not been built as shown on plans which may affect coverage if constructed as indicated, sprinklers in the electrical and telephone rooms shall be temp. rated per NFPA 13 2002 8.3.2.1, noted max. bending raduis must not be exceeded for flex head piping per manufacturer requirements, hydrostatic test for this portion of work is acceptable per discussion.
INSP-Sprinkler Rough-in/Hydro1/11/20081/14/20071/14/2007ACANC
DetailsForrest France
Daryl, ###-####
INSP-Sprinkler Rough-in/Hydro11/20/200611/22/200611/22/2006APART
DetailsForrest France
OH rough-in for the 2nd floor SW quad is good for cover. The hydrostatic test for this portion of the 2nd floor also passed inspection as noted on approved plans.
INSP-Sprinkler Rough-in/Hydro10/27/200610/30/200610/30/2006APART
DetailsForrest France
Second floor NW quad OH hydrostatic test passed. Rough-in is good for cover at the drop ceiling areas, noted one ssu in the electrical room which needs to be relocated as discussed.
INSP-Sprinkler Rough-in/Hydro10/6/200610/9/200610/9/2006PPART
DetailsForrest France
OH rough-in is good for cover at the 2nd floor NE quadrant as marked on approved plans, hydrostatic test for this area also passed inspection.
INSP-Sprinkler Rough-in/Hydro9/20/20069/21/20069/21/2006APART
DetailsForrest France
OH rough-in is acceptable to cover at the drop ceiling areas in the SE quadrant of the second floor as marked on approved plans. Hydrostatic test for this same area also performed satisfactory.