INSP-Final Inspection | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled
|
INSP-Final Inspection | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | FAIL |
Troy Cobbley
|
|
|
The phone line troubles do not report correctly. Also need to test the duct smoke detectors.
|
INSP-Final Inspection | 6/13/2007 | 6/18/2007 | 6/18/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where additional a/v's will be required to be installed. These areas were in question on the reviewed plans. Candella needs to be changed on several of the a/v's as marked on the plans. Also the duct smoke detectors are not attached securely to the duct, are oriented the wrong way and have incorrect sample tube lengths. Contractor is to supply the signals as well at the next inspection.
|
INSP-Final Inspection | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given by dave hanniman for the new areas to be occupied while the fire alarm and fire sprinkler systems are finished being installed.
|