Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR06-00595
StatusFinaled
Name ROMAR ELECTRIC
Site Address 1111 W JEFFERSON ST
Project NameBoise Cascade Building
Customer Number 
ePlanReview 
Description
Fire alarm system upgrade to include relocating manual pull stations to required ADA height, relocate firefighters emergency phone system jacks to inside adjacent stairwells, installation of new audible visual fire alarm notification devices, installation of new fire alarm power supplies and transponders on each levels indicated, installation of a stairwell pressurization system. Repair & installation of atrium smoke exhaust system, installation of smoke guard doors on freight elevator all levels except plaza level, and the installation of a new fire command center located on the exterior west side of the building. Beam detectors are shown to be added protecting the plaza level Atrium & walkway. The remodel work will occur in an existing 322,795 sq. ft. high-rise building that has a 77,950 sq. ft. basement to comply with some of the upgrade work outlined in a 4/17/06 Upgrade Agreement on file for this building. Upgrade work will include installing a complete fire sprinkler system throughout the building, removing existing sprayed fire-resistant materials containing asbestos and providing new sprayed fire-resistant materials, providing at least one accessible Men's and Women's restroom on each floor, Special Inspection required for sprayed fire-resistant materials and the smoke control system. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. NOTE: This building will be fully fire sprinklered under this permit. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/25/200811/25/200811/25/2008APASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Final Inspection11/3/200811/3/200811/3/2008PPART
DetailsForrest France
C/N items finished, record of completion forms to be submitted as discussed.
INSP-Final Inspection10/29/200810/29/200810/29/2008ANR
DetailsForrest France
Pending record of completion forms.
INSP-Final Inspection10/27/200810/27/200810/27/2008PPART
DetailsForrest France
Fire hat functionality both intermitent and solid tested satisfactory for all four elevators, final pending reciept of NFPA record of completion documents.
INSP-Final Inspection7/21/20087/22/20087/22/2008APART
DetailsForrest France
Final pending fire hat at elevators, per contractor the supervisory tamper switch at the 5th floor NE riser has been repaired and correctly programed-will verify at final inspection in conjunction with elevator controls as discussed.
INSP-Final Inspection7/3/20087/7/20087/7/2008AFAIL
DetailsForrest France
Reviewed and reinspected defficient items noted at the previous inspection including elevator shunt trip power supervision, recall for car #3, new FJ at the pump room, new antifreeze system tamper, flow switch at the NE 2nd floor stairway, tampers at riser and floor control valves. Two remaining items in need of repair include the 5th floor NE tamper at the OS&Y sprinkler control valve, and provision for a flashing fire hat at the elevator cars upon FA device activation in the hoistway or machine room.
INSP-Final Inspection6/3/20086/5/20086/5/2008PPART
DetailsForrest France
See list of correction notice items reviewed with contractor on site.
INSP-Conference6/3/20086/5/20086/5/2008PDONE
DetailsForrest France
jose Phone #: ###-#### Regarding balance of inspection work for permit final.
INSP-Alarm Testing5/15/20085/15/20085/15/2008APART
DetailsForrest France
Per contractor approved plan set indicates removal of existing spot type smoke detectors at the mechanical penthouse area-if installed spacing must meet code requirements, discussed schedule for next site visit 5/20.
INSP-Final Inspection5/6/20085/6/20085/7/2008PFAIL
DetailsForrest France
Inspection for elevator recall including testing lobby smoke detectors at all levels and elevator hoistway/ machine room devices. Noted shunt trip power supervision circut 20 address 122 did not report, SD 2031 is incorrectly located on the map (needs to be shown in the elevator machine room), the southeast car (elevator #3) is out of service-will need to verifiy recall at next visit, per ANSI/ASME A17.1-2000 Safety Code for Elevators- fire alarm initiating device activation in a machine room or hoistway shall cause the fire hat visual signal within the car to illuminate intermittently (2.27.3.2.6), noted SD locations at each of the four hoistways does not appear to meet requirements. Also noted spot type smoke detectors at the mechanical penthouse are not in compliance with NFPA 72 2002 sec. 5.7.3.2.1 and 5.7.3.2.4(B)(2) regarding mounting locations, beam obstructions and spacing 5.7.3.2.3 (A).
INSP-Final Inspection5/5/20085/5/20085/6/2008ADEFR
DetailsForrest France
See inspection comments dated 5/6.
INSP-Final Inspection5/1/20085/2/20085/2/2008ADEFR
DetailsForrest France
Scheduled by a contractor via Hello! on 5/1/2008 at 5:20:41 PM. Contact: ###-####.
INSP-Final Inspection4/23/20084/23/20084/23/2008PNR
DetailsForrest France
Scheduled by a contractor via Hello! on 4/23/2008 at 8:03:15 AM. Contact: ###-####.
INSP-Alarm Testing4/23/20084/23/20084/23/2008ACANC
DetailsForrest France
Duplicate inspection request.
INSP-Final Inspection4/21/20084/22/20084/23/2008APART
DetailsForrest France
Fire phones at all locations tested satisfactory, need to add one phone jack at the fire pump room. Also noted missing work table and land line phone at the fire command center to be provided as discussed.
INSP-Final Inspection3/31/20083/31/20083/31/2008PCANC
DetailsForrest France
Wes ###-#### cancelled today by wes
INSP-Final Inspection3/27/20083/27/20083/27/2008PNR
DetailsForrest France
Inspection to be rescheduled.
INSP-Alarm Testing3/13/20083/14/20083/14/2008APART
DetailsForrest France
Site inspection completed with respect to atrium beam detectors and smoke evacuation. Functional testing is satisfactory, approval pending verification of design data in correlation to actual test results.
INSP-Alarm Testing1/8/20081/9/20081/9/2008APART
DetailsForrest France
Fire alarm testing for the 3rd floor SW quad passed.
INSP-Alarm Testing12/10/200712/11/200712/11/2007APART
DetailsForrest France
Fire alarm testing for the 3rd floor NW quad area passed, noted correction items are complete.
INSP-Alarm Testing12/5/200712/7/200712/7/2007AFAIL
DetailsForrest France
Fire alarm inspection for the 3rd floor NW quad failed due to missing av notification devices at three locations including a conference room, file room and open area.
INSP-Alarm Testing11/7/200711/8/200711/8/2007APART
DetailsForrest France
FA testing for the 3rd floor NE quad passed per K. Roule.
INSP-Alarm Testing11/5/200711/7/200711/7/2007AFAIL
DetailsForrest France
FA inspection for the 3rd floor NE quad failed due to strobe synchronization issues.
INSP-Alarm Testing10/19/200710/22/200710/22/2007APART
DetailsForrest France
3rd floor SE quad fire alarm system modifications passed field testing.
INSP-Alarm Testing10/17/200710/19/200710/19/2007ACANC
DetailsForrest France
Overbooked
INSP-Alarm Testing5/10/20075/11/20075/14/2007PPART
DetailsForrest France
Fire alarm testing for the 1st floor SE quad as annotated on approved plans is satisfactory.
INSP-Alarm Testing5/9/20075/10/20075/10/2007ACANC
DetailsForrest France
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
INSP-Alarm Testing4/27/20074/27/20074/27/2007PPART
DetailsForrest France
See comments per field inspection by M. Timmerman scheduled for 4/28.
INSP-Alarm Testing4/23/20074/25/20074/26/2007PDEFR
DetailsForrest France
See comments per field inspection by M. Timmerman.
INSP-Alarm Testing4/12/20074/13/20074/13/2007APART
DetailsForrest France
Testing for the basement manual pulls at the stairway exits, SD at the service elevator, SD for stairway pressure, and plaza level manual pulls at ground level stairway exits.
INSP-Alarm Testing3/23/20073/27/20073/27/2007PCANC
DetailsForrest France
Pending correction of programing issues for descriptors and device address numbers matching an approved plan set.
INSP-Alarm Testing3/23/20073/26/20073/27/2007PDEFR
DetailsForrest France
See notes per field inspection completed by M. Timmerman.
INSP-Final Inspection3/12/20073/13/20073/13/2007AFAIL
DetailsForrest France
Re-inspection for the 4th floor corrections failed due to non-functional SD in the telephone and electrical rooms, and inadequate audibility for the SS notification devices.
INSP-Alarm Testing3/7/20073/9/20073/12/2007AFAIL
DetailsForrest France
Inspection for the 5th floor Office supply tenant alarm work failed due to non-functional speakers at several locations, two SD have incorrect descriptors, as-built plans should reflect field changes, the notification and initiation devices at the north hall are not installed at this time. Also verified added SS at the mech. penthouse. Attempted test of the 1st floor atrium doors failed due to non-functional manual pull station at the reception desk.
INSP-Alarm Testing3/1/20073/2/20073/2/2007APART
DetailsForrest France
Alarm testing for the 4th floor SE and SW quads only-retest of the av's passed but will need to add missing notification in conference room 4SE, manual pulls and SD at the SE tested okay , noted address # at the panel do not match two SD at the SW quad exit door and service elevator, also noted two non-functional SD in the SW telephone room and electrical room. Also tested av notification devices on the 2nd floor skybridges.
INSP-Alarm Testing1/24/20071/26/20071/26/2007AFAIL
DetailsForrest France
Partial alarm notification testing completed for the 4th floor SE and SW quads and the entire penthouse. Noted two non-functional pull stations and one non-functional strobe at the 4th floor, still need to test the SD in the electrical and telephone rooms, the penthouse is missing one strobe to be added, one a/v is not functional on audio, only one manual pull tested at this time.
INSP-Sprinkler Rough-in1/17/20071/18/20071/18/2007APART
DetailsForrest France
Partial preliminary inspection for the CM's at the fire pump control valve tamper switches, noted two OS&Y valves out of adjustment, jockey pump, test header and system bypass tampers tested okay, remainder of pump supervision test pending. Also completed walk through and preliminary inspection of the penthouse/mechanical areas and the beam detectors at the atrium level.
INSP-Alarm Testing1/10/20071/11/20071/11/2007APART
DetailsForrest France
Inspection for the basement level audio/visual alarm notification functionality and coverage only completed today, noted file room coverage is lacking, still need to test manual pulls, relocated SD's, check EOL voltage.
INSP-Alarm Testing12/29/20061/2/20071/3/2007APART
DetailsForrest France
Inspection for location, spacing, cd rating, and installation of fire alarm notification devices at the basement level only. Noted on approved plans areas which are lacking proper coverage including the break room, mech. room, transformer room, and one hallway, also noted that FA wire must be attatched to the building structure per NFPA 72, no access was provided for the womens locker area or one server room at this inspection, will require as-built drawings at the next scheduled inspection reflecting changes made.
INSP-Alarm Testing12/6/200612/11/200612/11/2006APART
DetailsForrest France
2nd floor SW quad alarm test completed satisfactory.
INSP-Alarm Testing11/21/200611/22/200611/22/2006APART
DetailsForrest France
Re-inspection for the NW quad to verify required corrections completed satisfactory.
INSP-Alarm Testing11/17/200611/20/200611/20/2006ADEFR
DetailsForrest France
don Note: if you cant do 6:30 we can do 5:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection to be rescheduled.
INSP-Alarm Testing11/13/200611/17/200611/17/2006AFAIL
DetailsForrest France
Missing notification in the large confrence room at the NW quad, complete coverage is lacking in one portion of the common hallway, approved plans do not reflect actual field installation-will need as-builts showing modifications, the SW quad is not ready for final alarm inspection as field tile, lighting, finishes, etc. are not in place.
INSP-Conference10/20/200610/24/200610/24/2006ADEFR
DetailsForrest France
Confrence to discuss location of beam detectors to be completed by M. Timmerman.
INSP-Alarm Testing10/17/200610/20/200610/20/2006AFAIL
DetailsForrest France
Testing for the 2nd floor NE quad only, need to relocate one notifcation device as marked on plans for proper coverage, missing one h/s at the west side division between quadrants, added sd at the electrical room to be shown on plans.
INSP-Alarm Testing10/13/200610/19/200610/19/2006ADEFR
DetailsForrest France
Inspection to be performed on 10/20 per agreement.
INSP-Final Inspection10/6/200610/6/200610/6/2006PFAIL
DetailsTroy Cobbley
See Mike's inspection notes for items of this afternoons inspection
INSP-Sprinkler Rough-in10/5/200610/6/200610/6/2006AFAIL
DetailsTroy Cobbley
See Mike's inspection comments for correction items.
INSP-Alarm Testing4/17/20074/18/2007 P 
DetailsForrest France
don - after 5p, said he talked to forrest; Phone #: ###-#### Internet Inspection Request from: Victoria Beall