INSP-Final Inspection | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground permit finaled
|
INSP-Final Inspection | 12/5/2006 | 12/6/2006 | 12/6/2006 | P | FAIL |
Troy Cobbley
|
|
|
Still need the alarm connections tested. Need two additional tamper switches for the anti-freeze loop backflow preventor per IFC 903.4.1, need forward flush, head wrench, backflow certification, trapeze calcs and wall to deck in the warehouse as per the previous inspection entry.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Forrest France
|
|
|
AG hydrostatic test of the wet and antifreeze systems are acceptable.
|
INSP-Sprinkler Rough-in | 10/19/2006 | 10/20/2006 | 10/20/2006 | P | PASS |
Troy Cobbley
|
|
|
Overhead sprinkler system rough-in is passed. Contractor needs to provide calculations for the trapeze hangers and provide a full height wall between the office area and the warehouse as shown on the plans.
|
INSP-Supply line flush | 10/17/2006 | 10/18/2006 | 10/18/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Supply line flush | 10/16/2006 | 10/17/2006 | 10/17/2006 | A | CANC |
Troy Cobbley
|
|
|
Contractor is not ready for the underground flush
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2006 | 10/17/2006 | 10/17/2006 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 8/25/2006 | 8/28/2006 | 8/28/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground piping is ok to bury.
|