Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00651
StatusFinaled
Name ADT SECURITY SERVICES INC
Site Address 909 E RESERVE ST
Project NameMARQUIS CARE - SHAW MOUNTAIN
Customer Number 
ePlanReview 
Description
The project includes the installation of New NAC Panel. New, Replacement and Relocation of Existing Audible / Visual devices scattered throughout the facility and Replacement of existing Duct Smoke Detectors to include new Remote LED Indicators and Test Switches. The project includes monitoring of the Existing Kitchen Hood Ansul System and the addition of one MPS, Area & Corridor smoke detectors that will be installed as indicated on the project plans. Building Permit BLD02-00194 and BLD05-00849 are not yet complete in this facility, Total area now indicated to be 43,366 sq. ft./ 423 occ. load/ V-1hour/ R-2 zone/ 40 psf . The building is fully sprinklered & alarmed and this remodel & code upgrade will create 2 builidngs of V-1 Hour with a 2-hour area separation wall dividing into areas of 20,747 sf East wing and a 22,619 sf West Wing. Maximum allowable area under 1997 UBC for each wing: Basic Area - 5,200 s.f. x 1.5 for two yards x 3 for fully sprinklered = 23,400 s.f.each side of 2-hour area separation wall. Existing C.O for 1972 edition, #1104 indicate 200 occupant load; D-3, V-1, 16,059 sq. ft., R-2 zone, 40 psf, C.U. 4-23-69. 1961 construction was for 30,820 s.f.; V-1hour; D3; FZ 3, Zone 'A'; OL - 176 + 47 office= 223 total
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/15/20072/15/20072/15/2007PPASS
DetailsForrest France
Fire alarm permit finaled.
INSP-Alarm Testing2/13/20072/13/20072/13/2007PPASS
DetailsTroy Cobbley
Permit finaled. Items on from last inspection have been corrected.
INSP-Alarm Testing2/6/20072/7/20072/8/2007PFAIL
DetailsTroy Cobbley
See Mike Timmermans entry from 2/7/2006
INSP-Final Inspection1/24/20071/25/20071/26/2007PFAIL
DetailsForrest France
Per field inspection completed by M. Timmerman defficiencies noted and some revisions will be required.
INSP-Final Inspection1/22/20071/24/20071/24/2007PDEFR
DetailsForrest France
Inspection rescheduled per conversation with contractor.