INSP-Final Inspection | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been field verified for compliance, fire sprinkler final inspection passed.
|
INSP-Final Inspection | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | DEFR |
Forrest France
|
|
|
No time available to complete inspection.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2007 | 2/28/2007 | 2/28/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test of the wet system passed, rough-in is okay, noted the need to install flex couplings at the mains on each side of the CMU wall where the pipe passes through and min. seismic clearance is not provided.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | NR |
Forrest France
|
|
|
Inspection rescheduled per phone call with contractor.
|
INSP-Supply line flush | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | CANC |
Forrest France
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2006 | 11/6/2006 | 11/6/2006 | P | DEFR |
Forrest France
|
|
|
Wrong permit number called in, was intended for the project related UG permitted work.
|