INSP-Final Inspection | 3/13/2007 | 3/15/2007 | 3/15/2007 | A | PASS |
Forrest France
|
|
|
Required corrections have been field verified for compliance, final fire sprinkler inspection passed, permit finaled.
|
INSP-Final Inspection | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | FAIL |
Forrest France
|
|
|
Ordinary temp SW heads in the skylights on the second floor are not permitted, need to provide a "911" sign at the outside bell, contractor to provide a pitot guage and playpipes to enable forward flow testing of the BFP as indicated in plan attatched fire code review notes.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed. Noted two heads at the entryway high ceiling area which exceed max. allowable 130ft/2 for this system, the FDC ball drip will not function properly as installed, missing one flex coupling at the 21/2 feed to the lower office area where it passes through the floor, ssu's below the stairs at two locations are not installed, the remainder of system rough-in appears acceptable.
|
INSP-Sprinkler Rough-in | 12/14/2006 | 12/19/2006 | 12/19/2006 | P | DEFR |
Forrest France
|
|
|
steve - 200 lb test ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith No time available to complete this inspection today, to be rescheduled per phone conversation with contractor as agreed.
|
INSP-Supply line flush | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PART |
Forrest France
|
|
|
UG fire supply line flush performed satisfactory.
|
INSP-Supply line flush | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | CANC |
Forrest France
|
|
|
Per phone call from contractor, not ready for inspection, to be rescheduled.
|