INSP-Final Inspection | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/10/2007 | 1/11/2007 | 1/11/2007 | P | CANC |
Troy Cobbley
|
|
|
Per discussion with Troy this inspection will be rescheduled with the alarms and life safety
|
INSP-Sprinkler Rough-in/Hydro | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test on the dry system and the forward flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | PART |
Troy Cobbley
|
|
|
Overhead hydro test passed for the wet system. 24 hour air test started on the dry system at 8:30 with 40 3/4psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | PART |
Troy Cobbley
|
|
|
Wet system sprinkler piping is ok to cover except the three areas where the earthquaking still needs to be installed.
|
INSP-Sprinkler Rough-in/Hydro | 11/21/2006 | 11/21/2006 | 11/21/2006 | | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2006 | 10/13/2006 | 10/13/2006 | A | PASS |
Troy Cobbley
|
|
|
Dry system sprinkler piping ok to cover. I went over the requirement for resubmitting the fdc location with troy.
|