INSP-Final Inspection | 2/19/2007 | 2/22/2007 | 2/22/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled.
|
INSP-Final Inspection | 2/16/2007 | 2/16/2007 | 2/20/2007 | P | CANC |
Troy Cobbley
|
|
|
Per Ron this will need to be rescheduled.
|
INSP-Final Inspection | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | FAIL |
Troy Cobbley
|
|
|
Resubmittals may be required. See rough-in inspection entry.
|
INSP-Sprinkler Rough-in | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping rough-in inspection for the most part passed. There are two locations where there are issues. The first is in area #2 on the roof where the plans show the piping to be 2" but 1 1/2" is installed. The second problem is also in area #2 where the piping is supplied from the lower level. The plans indicate a single tie in to a 2" branchline but as installed the piping has two tie in points for a rudimentary loop. This will require a resubmittal for plan review to verify the calculations.
|
INSP-Final Inspection | 12/14/2006 | 12/15/2006 | 12/15/2006 | P | DEFR |
Forrest France
|
|
|
ronnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
INSP-Sprinkler Rough-in | 12/14/2006 | 12/15/2006 | 12/15/2006 | P | CANC |
Forrest France
|
|
|
No time available to complete inspeciton today.
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test began at 12:30 with the guage reading 43 psi
|