Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00890
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 600
Project NameUS BANK-6TH FLR
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
This alteration of the sixth floor fire sprinkler system is being made to accommodate a new ceiling layout. The scope is limited to the relocation of sprinkler heads only. This modification does not appear to adversely affect the operation of the existing system. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The scope of the sprinkler work includes relocating 25 down heads into the new ceiling layout. When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The "Riser" and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. This work is attached to BLD06-02994.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20072/22/20072/22/2007APASS
DetailsForrest France
Fire sprinkler inspection passed, permit finaled.
INSP-Sprinkler Rough-in1/31/20072/1/20072/1/2007APART
DetailsForrest France
Per field inspection by B. Johnson, OH rough-in is approved for cover.
INSP-Final Inspection1/8/20071/9/20071/9/2007APART
DetailsForrest France
The south half of the permitted work scope area is completed and approved, final pending completion of the north half or "phase two" of the project.
INSP-Sprinkler Rough-in12/11/200612/11/200612/11/2006PPART
DetailsForrest France
OH sprinkler rough-in is good for cover at the drop ceilings in the areas as noted on approved plan set.